Paid on 496 local government issues in BRB's local issuance fee table, $15,777,445 in fees reported.
By role
Issues
496 issues, newest first.
Skip the issues locke lord llp worked on table| Issue? | Issuer? | Closed? | FY? | Role? | Sale type? | Par? | Fees to this firm? | Per $1,000 of par? |
|---|---|---|---|---|---|---|---|---|
| Contract Tax Rev Bonds Ser 2025 | Paseo del Este MUD 01 | 1/23/2025 | 2025 | Printing, disclosure and data services | Competitive | $4,500,000 | $25,000 | $5.56 |
| Spec Assessment Rev Bonds Ser 2024 (Impr Area 3 Proj) | Club MMD 1 | 12/19/2024 | 2025 | Underwriter's counsel | Negotiated | $17,270,000 | $172,700 | Not reported |
| Unl Tax Bonds Ser 2024 | Paseo del Este MUD 01 | 12/19/2024 | 2025 | Disclosure counsel | Competitive | $1,690,000 | $8,500 | $5.03 |
| Spec Assessment Rev Bonds Ser 2024 (Whisper Valley PID Impr Area 3) | Austin | 12/18/2024 | 2025 | Other counsel | Negotiated | $11,990,000 | $9,500 | $0.79 |
| Jr Lien Spec Assessment Rev Bonds Ser 2024B (Tabor Ranch PID Impr Area 1 Proj) | Denton County | 12/12/2024 | 2025 | Underwriter's counsel | Negotiated | $17,371,000 | $173,710 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Tabor Ranch PID Major Impr Area Proj) | Denton County | 12/12/2024 | 2025 | Underwriter's counsel | Negotiated | $23,580,000 | $235,800 | Not reported |
| Sr Lien Spec Assessment Rev Bonds Ser 2024A (Tabor Ranch PID Impr Area 1 Proj) | Denton County | 12/12/2024 | 2025 | Underwriter's counsel | Negotiated | $34,920,000 | $349,200 | Not reported |
| Airport Sys Spec Facil Rev Bonds Ser 2024B (United Airlines Inc Terminal Imp Proj) (AMT) | Houston | 12/2/2024 | 2025 | Other counsel | Negotiated | $1,100,000,000 | $30,000 | $0.03 |
| Spec Assessment Rev Bonds Ser 2024 (Friendswood City Center PID Initial Major Impr Proj) | Friendswood | 11/27/2024 | 2025 | Underwriter's counsel | Negotiated | $36,907,000 | $369,070 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Southridge PID Impr Area 2 Proj) | Princeton | 11/21/2024 | 2025 | Underwriter's counsel | Negotiated | $9,532,000 | $95,320 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Windmore PID Impr Area 1 Proj) | Princeton | 11/21/2024 | 2025 | Underwriter's counsel | Negotiated | $4,585,000 | $45,850 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Anderson Park PID Impr Area 1 Proj) | Uhland | 11/19/2024 | 2025 | Underwriter's counsel | Negotiated | $6,953,000 | $69,530 | $10.00 |
| Spec Assessment Rev Bonds Ser 2024 (Solterra PID Impr Area C-3 Proj) | Mesquite | 11/4/2024 | 2025 | Underwriter's counsel | Negotiated | $5,435,000 | $54,350 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Kaufman PID 3 Proj) | Kaufman | 10/24/2024 | 2025 | Underwriter's counsel | Negotiated | $2,898,000 | Not reported | Not reported |
| Comb Tax & Rev CO Ser 2024 | Lancaster | 10/24/2024 | 2025 | Underwriter's counsel | Negotiated | $15,740,000 | $11,805 | $0.75 |
| Comb Tax & Rev CO Ser 2024B | Laredo | 10/16/2024 | 2025 | Underwriter's counsel | Negotiated | $4,090,000 | $1,841 | Not reported |
| Comb Tax & Rev CO Ser 2024A | Laredo | 10/16/2024 | 2025 | Underwriter's counsel | Negotiated | $27,445,000 | $12,350 | Not reported |
| WW & SS Rev Bonds New Ser 2024 | Laredo | 10/16/2024 | 2025 | Underwriter's counsel | Negotiated | $93,315,000 | $41,992 | Not reported |
| Unl Tax Bonds Ser 2024 | Paseo Del Este MUD 06 | 10/15/2024 | 2025 | Disclosure counsel | Competitive | $2,500,000 | $8,500 | $3.40 |
| Second Tier Rev Ref Bonds Ser 2024B | North Texas Tollway Authority | 10/8/2024 | 2025 | Other counsel; Bond counsel | Negotiated | $676,290,000 | $391,324 | $0.58 |
| Sys First Tier Rev Ref Bonds Ser 2024A | North Texas Tollway Authority | 10/8/2024 | 2025 | Other counsel; Disclosure counsel | Negotiated | $458,885,000 | $265,181 | $0.58 |
| Spec Assessment Rev Bonds Ser 2024 (Cottonwood PID Impr Area 1 Proj) | Dorchester | 10/2/2024 | 2025 | Underwriter's counsel | Negotiated | $14,546,000 | $145,460 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Cottonwood PID Major Impr Area Proj) | Dorchester | 10/2/2024 | 2025 | Underwriter's counsel | Negotiated | $6,345,000 | $63,450 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Winchester Crossing PID 3 Proj) | Princeton | 9/24/2024 | 2025 | Underwriter's counsel | Negotiated | $11,547,000 | $115,470 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Eastridge PID Impr Area 3 Proj) | Princeton | 9/24/2024 | 2025 | Underwriter's counsel | Negotiated | $17,342,000 | $173,420 | Not reported |
| Spec Assessment Rev Bonds Ser 2024(Thunder Rock PID Remainder Area Proj) | Marble Falls | 9/12/2024 | 2025 | Underwriter's counsel | Negotiated | $7,726,000 | $77,260 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Thunder Rock PID Impr Area 2A Proj) | Marble Falls | 9/12/2024 | 2025 | Underwriter's counsel | Negotiated | $8,828,000 | $88,280 | Not reported |
| Comb Tax & Rev CO Ser 2024 | Waxahachie | 9/4/2024 | 2025 | Underwriter's counsel | Negotiated | $38,885,000 | $26,442 | Not reported |
| Spec Assessment Rev Ref Bonds Ser 2024 (Wells South PID Major Impr Area Proj) | Celina | 8/30/2024 | 2024 | Underwriter's counsel | Negotiated | $6,620,000 | $66,200 | Not reported |
| Spec Assessment Rev Ref Bonds Ser 2024 (Wells South PID Neighborhood Impr Area 1 Proj) | Celina | 8/30/2024 | 2024 | Underwriter's counsel | Negotiated | $4,702,000 | $47,020 | Not reported |
| Spec Assessment Rev Ref Bonds Ser 2024 (Sutton Fields 2 PID Major Impr Area Proj) | Celina | 8/30/2024 | 2024 | Underwriter's counsel | Negotiated | $13,563,000 | $135,630 | Not reported |
| Spec Assessment Rev Ref Bonds Ser 2024 (Sutton Fields 2 PID Neighborhood Impr Area 1 Proj) | Celina | 8/30/2024 | 2024 | Underwriter's counsel | Negotiated | $9,412,000 | $94,120 | Not reported |
| Unl Tax Bonds Ser 2024 | Paseo del Este MUD 04 | 8/21/2024 | 2024 | Disclosure counsel | Competitive | $2,895,000 | $8,500 | $2.94 |
| Wharves & Terminal First Lien Rev Bonds Ser 2024A (AMT) | Galveston | 8/15/2024 | 2024 | Other counsel | Negotiated | $106,125,000 | $12,101 | $0.11 |
| Wharves & Terminal First Lien Rev Bonds Ser 2024B (Non-AMT) | Galveston | 8/15/2024 | 2024 | Other counsel | Negotiated | $50,710,000 | $5,899 | $0.12 |
| Unl Tax Bonds Ser 2024 | Paseo del Este MUD 02 | 8/13/2024 | 2024 | Disclosure counsel | Competitive | $3,700,000 | $8,500 | $2.30 |
| Spec Assessment Rev Bonds Ser 2024 (Spiritas Ranch PID Future Impr Area Proj) | Little Elm | 7/16/2024 | 2024 | Underwriter's counsel | Negotiated | $6,611,000 | $66,110 | Not reported |
| Unl Tax Ref Bonds Ser 2024 | DeSoto ISD | 7/10/2024 | 2024 | Underwriter's counsel | Negotiated | $24,245,000 | $14,500 | Not reported |
| Spec Assessment Rev Bonds Ser 2024 (Sanctuary East PID Impr Area 1 Proj) | Salado | 6/27/2024 | 2024 | Underwriter's counsel | Negotiated | $4,710,000 | $47,100 | Not reported |
| Dock & Wharf Facil Rev Bonds Ser 2024A (Jefferson Gulf Coast Energy Proj) | Port of Beaumont ND | 6/20/2024 | 2024 | Other costs | Negotiated | $164,425,000 | $65,000 | $0.40 |
| Facil Rev Bonds Txbl Ser 2024B (Jefferson Gulf Coast Energy Proj) | Port of Beaumont ND | 6/20/2024 | 2024 | Other costs | Negotiated | $217,870,000 | $65,000 | $0.30 |
| Tax Notes Ser 2024 | Wise County | 6/11/2024 | 2024 | Underwriter's counsel | Negotiated | $9,565,000 | $7,500 | Not reported |
| Hosp Rev Bonds Ser 2024A | Midland County Hospital District (Midland Memorial) | 4/24/2024 | 2024 | Other costs | Negotiated | $86,640,000 | $24,373 | $0.28 |
| Comb Tax & Ltd Pledge Rev CO Ser 2024 | Duval County | 3/12/2024 | 2024 | Other counsel | Private placement | $2,600,000 | $3,500 | $1.35 |
| Spec Assessment Rev Ref Bonds Ser 2024 (Jackson Ridge PID Phase 1 & Phase 2 Assessments) | Aubrey | 2/29/2024 | 2024 | Underwriter's counsel | Negotiated | $23,239,000 | $232,390 | Not reported |
| Spec Assessment Rev Ref Bonds Ser 2024 (Jackson Ridge PID Phase 3 Major Impr Assessments) | Aubrey | 2/29/2024 | 2024 | Underwriter's counsel | Negotiated | $3,853,000 | $38,530 | Not reported |
| Unl Tax Ref Bonds Ser 2024 | Mesquite ISD | 1/31/2024 | 2024 | Underwriter's counsel | Negotiated | $11,940,000 | $10,000 | Not reported |
| Spec Assessment Rev Bonds Ser 2023 (Durango PID Impr Area 1 Proj) | Mustang Ridge | 12/14/2023 | 2024 | Underwriter's counsel | Negotiated | $6,374,000 | $63,740 | Not reported |
| Comb Tax & Rev CO Ser 2023 | Lancaster | 12/12/2023 | 2024 | Underwriter's counsel | Negotiated | $29,415,000 | $30,001 | Not reported |
| Unl Tax Bonds Ser 2023 | Paseo del Este MUD 10 | 12/7/2023 | 2024 | Disclosure counsel | Competitive | $1,800,000 | $8,500 | $4.72 |
| Total, all 496 | $15,777,445 |
Contract Tax Rev Bonds Ser 2025
- Closed
- 1/23/2025
- FY
- 2025
- Role
- Printing, disclosure and data services
- Sale type
- Competitive
- Par
- $4,500,000
- Fees to this firm
- $25,000
- Per $1,000 of par
- $5.56
Spec Assessment Rev Bonds Ser 2024 (Impr Area 3 Proj)
- Closed
- 12/19/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $17,270,000
- Fees to this firm
- $172,700
- Per $1,000 of par
- Not reported
- Closed
- 12/19/2024
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Competitive
- Par
- $1,690,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- $5.03
Spec Assessment Rev Bonds Ser 2024 (Whisper Valley PID Impr Area 3)
- Closed
- 12/18/2024
- FY
- 2025
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $11,990,000
- Fees to this firm
- $9,500
- Per $1,000 of par
- $0.79
Jr Lien Spec Assessment Rev Bonds Ser 2024B (Tabor Ranch PID Impr Area 1 Proj)
- Closed
- 12/12/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $17,371,000
- Fees to this firm
- $173,710
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Tabor Ranch PID Major Impr Area Proj)
- Closed
- 12/12/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $23,580,000
- Fees to this firm
- $235,800
- Per $1,000 of par
- Not reported
Sr Lien Spec Assessment Rev Bonds Ser 2024A (Tabor Ranch PID Impr Area 1 Proj)
- Closed
- 12/12/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $34,920,000
- Fees to this firm
- $349,200
- Per $1,000 of par
- Not reported
Airport Sys Spec Facil Rev Bonds Ser 2024B (United Airlines Inc Terminal Imp Proj) (AMT)
- Closed
- 12/2/2024
- FY
- 2025
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $1,100,000,000
- Fees to this firm
- $30,000
- Per $1,000 of par
- $0.03
Spec Assessment Rev Bonds Ser 2024 (Friendswood City Center PID Initial Major Impr Proj)
- Closed
- 11/27/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $36,907,000
- Fees to this firm
- $369,070
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Southridge PID Impr Area 2 Proj)
- Closed
- 11/21/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,532,000
- Fees to this firm
- $95,320
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Windmore PID Impr Area 1 Proj)
- Closed
- 11/21/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $4,585,000
- Fees to this firm
- $45,850
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Anderson Park PID Impr Area 1 Proj)
- Closed
- 11/19/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,953,000
- Fees to this firm
- $69,530
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2024 (Solterra PID Impr Area C-3 Proj)
- Closed
- 11/4/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $5,435,000
- Fees to this firm
- $54,350
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Kaufman PID 3 Proj)
- Closed
- 10/24/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $2,898,000
- Fees to this firm
- Not reported
- Per $1,000 of par
- Not reported
- Closed
- 10/24/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $15,740,000
- Fees to this firm
- $11,805
- Per $1,000 of par
- $0.75
- Closed
- 10/16/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $4,090,000
- Fees to this firm
- $1,841
- Per $1,000 of par
- Not reported
- Closed
- 10/16/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $27,445,000
- Fees to this firm
- $12,350
- Per $1,000 of par
- Not reported
WW & SS Rev Bonds New Ser 2024
- Closed
- 10/16/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $93,315,000
- Fees to this firm
- $41,992
- Per $1,000 of par
- Not reported
- Closed
- 10/15/2024
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Competitive
- Par
- $2,500,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- $3.40
Second Tier Rev Ref Bonds Ser 2024B
- Closed
- 10/8/2024
- FY
- 2025
- Role
- Other counsel; Bond counsel
- Sale type
- Negotiated
- Par
- $676,290,000
- Fees to this firm
- $391,324
- Per $1,000 of par
- $0.58
Sys First Tier Rev Ref Bonds Ser 2024A
- Closed
- 10/8/2024
- FY
- 2025
- Role
- Other counsel; Disclosure counsel
- Sale type
- Negotiated
- Par
- $458,885,000
- Fees to this firm
- $265,181
- Per $1,000 of par
- $0.58
Spec Assessment Rev Bonds Ser 2024 (Cottonwood PID Impr Area 1 Proj)
- Closed
- 10/2/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $14,546,000
- Fees to this firm
- $145,460
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Cottonwood PID Major Impr Area Proj)
- Closed
- 10/2/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,345,000
- Fees to this firm
- $63,450
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Winchester Crossing PID 3 Proj)
- Closed
- 9/24/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $11,547,000
- Fees to this firm
- $115,470
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Eastridge PID Impr Area 3 Proj)
- Closed
- 9/24/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $17,342,000
- Fees to this firm
- $173,420
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024(Thunder Rock PID Remainder Area Proj)
- Closed
- 9/12/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $7,726,000
- Fees to this firm
- $77,260
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Thunder Rock PID Impr Area 2A Proj)
- Closed
- 9/12/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $8,828,000
- Fees to this firm
- $88,280
- Per $1,000 of par
- Not reported
- Closed
- 9/4/2024
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $38,885,000
- Fees to this firm
- $26,442
- Per $1,000 of par
- Not reported
Spec Assessment Rev Ref Bonds Ser 2024 (Wells South PID Major Impr Area Proj)
- Closed
- 8/30/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,620,000
- Fees to this firm
- $66,200
- Per $1,000 of par
- Not reported
Spec Assessment Rev Ref Bonds Ser 2024 (Wells South PID Neighborhood Impr Area 1 Proj)
- Closed
- 8/30/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $4,702,000
- Fees to this firm
- $47,020
- Per $1,000 of par
- Not reported
Spec Assessment Rev Ref Bonds Ser 2024 (Sutton Fields 2 PID Major Impr Area Proj)
- Closed
- 8/30/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $13,563,000
- Fees to this firm
- $135,630
- Per $1,000 of par
- Not reported
Spec Assessment Rev Ref Bonds Ser 2024 (Sutton Fields 2 PID Neighborhood Impr Area 1 Proj)
- Closed
- 8/30/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,412,000
- Fees to this firm
- $94,120
- Per $1,000 of par
- Not reported
- Closed
- 8/21/2024
- FY
- 2024
- Role
- Disclosure counsel
- Sale type
- Competitive
- Par
- $2,895,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- $2.94
Wharves & Terminal First Lien Rev Bonds Ser 2024A (AMT)
- Closed
- 8/15/2024
- FY
- 2024
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $106,125,000
- Fees to this firm
- $12,101
- Per $1,000 of par
- $0.11
Wharves & Terminal First Lien Rev Bonds Ser 2024B (Non-AMT)
- Closed
- 8/15/2024
- FY
- 2024
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $50,710,000
- Fees to this firm
- $5,899
- Per $1,000 of par
- $0.12
- Closed
- 8/13/2024
- FY
- 2024
- Role
- Disclosure counsel
- Sale type
- Competitive
- Par
- $3,700,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- $2.30
Spec Assessment Rev Bonds Ser 2024 (Spiritas Ranch PID Future Impr Area Proj)
- Closed
- 7/16/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,611,000
- Fees to this firm
- $66,110
- Per $1,000 of par
- Not reported
- Closed
- 7/10/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $24,245,000
- Fees to this firm
- $14,500
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2024 (Sanctuary East PID Impr Area 1 Proj)
- Closed
- 6/27/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $4,710,000
- Fees to this firm
- $47,100
- Per $1,000 of par
- Not reported
Dock & Wharf Facil Rev Bonds Ser 2024A (Jefferson Gulf Coast Energy Proj)
- Closed
- 6/20/2024
- FY
- 2024
- Role
- Other costs
- Sale type
- Negotiated
- Par
- $164,425,000
- Fees to this firm
- $65,000
- Per $1,000 of par
- $0.40
Facil Rev Bonds Txbl Ser 2024B (Jefferson Gulf Coast Energy Proj)
- Closed
- 6/20/2024
- FY
- 2024
- Role
- Other costs
- Sale type
- Negotiated
- Par
- $217,870,000
- Fees to this firm
- $65,000
- Per $1,000 of par
- $0.30
- Closed
- 6/11/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,565,000
- Fees to this firm
- $7,500
- Per $1,000 of par
- Not reported
- Closed
- 4/24/2024
- FY
- 2024
- Role
- Other costs
- Sale type
- Negotiated
- Par
- $86,640,000
- Fees to this firm
- $24,373
- Per $1,000 of par
- $0.28
Comb Tax & Ltd Pledge Rev CO Ser 2024
- Closed
- 3/12/2024
- FY
- 2024
- Role
- Other counsel
- Sale type
- Private placement
- Par
- $2,600,000
- Fees to this firm
- $3,500
- Per $1,000 of par
- $1.35
Spec Assessment Rev Ref Bonds Ser 2024 (Jackson Ridge PID Phase 1 & Phase 2 Assessments)
- Closed
- 2/29/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $23,239,000
- Fees to this firm
- $232,390
- Per $1,000 of par
- Not reported
Spec Assessment Rev Ref Bonds Ser 2024 (Jackson Ridge PID Phase 3 Major Impr Assessments)
- Closed
- 2/29/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $3,853,000
- Fees to this firm
- $38,530
- Per $1,000 of par
- Not reported
- Closed
- 1/31/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $11,940,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2023 (Durango PID Impr Area 1 Proj)
- Closed
- 12/14/2023
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,374,000
- Fees to this firm
- $63,740
- Per $1,000 of par
- Not reported
- Closed
- 12/12/2023
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $29,415,000
- Fees to this firm
- $30,001
- Per $1,000 of par
- Not reported
- Closed
- 12/7/2023
- FY
- 2024
- Role
- Disclosure counsel
- Sale type
- Competitive
- Par
- $1,800,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- $4.72
Rows 1–50 of 496
Fees are as BRB's table reports them for each issue. The underwriter's spread counts once, and median and per-$1,000 figures use the issuer's one-time costs only: rows paid by the underwriter are shown in the fees but not added to them (how the participant tables are made).
EMMA links appear after review.
Source: Local Issuance Fee By Year (updated by the publisher 10/6/2026). Loaded here 10/9/2026.
Texas fiscal years run September 1 to August 31.
Issuer names are shown as published, without source footnote letters.
Figures are as reported to the agency and have not been independently verified.