City · Harris County · id 101-124-03
Houston
$15,359,469,488 of principal outstanding on 94 issues at the end of fiscal year 2025.
Fiscal year 2025 at a glance
Principal outstanding
$15.36 billion
Fiscal year 2025
$15,359,469,488
Interest still to be paid
$7.42 billion
Fiscal year 2025
$7,420,267,669
Total debt service outstanding
$22.78 billion
Fiscal year 2025
$22,779,737,157
Issues outstanding
94
Fiscal year 2025
Tax rate (total, per $100 of value)
0.5192
Fiscal year 2025
Taxable value
$328.8 billion
Fiscal year 2025
$328,799,762,617
Tax-supported principal to taxable value
1.07%
Fiscal year 2025
Computed here from the reported figures.
Principal per resident
$6,426
Fiscal year 2025
Computed here from the reported figures (population 2,390,125).
Debt outstanding by fiscal year
Download CSV| Fiscal year | Principal | Interest | Total debt service | Issues | Tax rate | Taxable value |
|---|---|---|---|---|---|---|
| 2025 | $15,359,469,488 | $7,420,267,669 | $22,779,737,157 | 94 | 0.5192 | $328,799,762,617 |
| 2024 | $14,283,730,992 | $6,578,533,371 | $20,862,264,363 | 92 | 0.5192 | $325,462,398,809 |
| 2023 | $13,411,634,566 | $5,956,712,136 | $19,368,346,702 | 94 | 0.5336 | $292,865,607,625 |
| 2022 | $13,554,123,777 | $5,918,998,496 | $19,473,122,273 | 97 | 0.5508 | $268,867,436,469 |
| 2021 | $14,051,758,024 | $6,485,515,798 | $20,537,273,822 | 102 | 0.5618 | $263,513,685,960 |
| 2020 | $13,410,357,127 | $6,523,679,394 | $19,934,036,521 | 96 | 0.5679 | $248,262,444,306 |
| 2019 | $13,246,559,063 | $6,939,993,172 | $20,186,552,235 | 94 | 0.5883 | $233,198,663,817 |
| 2018 | $13,504,998,270 | $7,427,185,605 | $20,932,183,875 | 96 | 0.5842 | $230,832,381,917 |
| 2017 | $12,150,083,646 | $6,643,901,889 | $18,793,985,535 | 95 | 0.5864 | $223,820,382,853 |
| 2016 | $12,290,719,575 | $7,047,916,096 | $19,338,635,671 | 95 | 0.6011 | $206,241,548,273 |
Issues outstanding, fiscal year 2025
Download CSV| Issue | Closed | Pledge | Purpose | Final maturity | Principal | Interest |
|---|---|---|---|---|---|---|
| Airport Sys Spec Facil Rev Bonds Ser 2024B (United Airlines Inc Terminal Imp Proj) (AMT) | Dec 2, 2024 | Revenue | Commerce | Jul 1, 2040 | $1,100,000,000 | $709,490,789 |
| Txbl Pension Obligation Bonds Ser 2017 | Dec 15, 2017 | Tax-supported (general obligation) | Pension obligations | Mar 1, 2047 | $928,970,000 | $540,130,723 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2024A | May 14, 2024 | Revenue | Refunding | May 15, 2055 | $870,280,000 | $400,070,306 |
| Combined Util Sys First Lien Rev & Ref Bonds Ser 2016B | Mar 8, 2016 | Revenue | Combined utility system | May 15, 2046 | $800,955,000 | $370,403,350 |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2025A (AMT) | Aug 13, 2025 | Revenue | Economic development | Jul 1, 2055 | $677,820,000 | $712,259,939 |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2023A (AMT) | Jul 19, 2023 | Revenue | Transportation | Jul 1, 2053 | $647,865,000 | $531,150,113 |
| GO Ref Bonds Ser 2024A | Jul 18, 2024 | Tax-supported (general obligation) | Refunding | Mar 1, 2051 | $600,325,000 | $550,023,681 |
| Combined Util Sys First Lien Rev Ref Bonds Txbl Ser 2019C | Sep 17, 2019 | Revenue | Refunding | May 15, 2043 | $488,195,000 | $116,727,783 |
| Combined Util Sys First Lien Rev & Ref Bonds Ser 2020C | Jul 1, 2020 | Revenue | Water and sewer | May 15, 2050 | $396,185,000 | $224,555,950 |
| Combined Util Sys First Lien Rev & Ref Bonds Ser 2014D | Jul 9, 2014 | Revenue | General purpose | May 15, 2045 | $346,465,000 | $145,762,775 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2018D | Aug 21, 2018 | Revenue | Refunding | May 15, 2049 | $294,150,000 | $169,544,450 |
| Pub Impr Ref Bonds Ser 2017A | Dec 13, 2017 | Tax-supported (general obligation) | Refunding | Mar 1, 2037 | $293,715,000 | $67,859,400 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2018D | Aug 2, 2018 | Revenue | Refunding | Jul 1, 2039 | $279,195,000 | $118,234,500 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2021A | Jun 22, 2021 | Revenue | Refunding | Jul 1, 2048 | $278,260,000 | $166,367,350 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2020C (Txbl) | Oct 20, 2020 | Revenue | Refunding | Jul 1, 2032 | $266,055,000 | $22,292,825 |
| Pub Impr & Ref Bonds Ser 2023A | Oct 25, 2023 | Tax-supported (general obligation) | General purpose | Mar 1, 2043 | $263,645,000 | $160,140,238 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2021A | Jun 24, 2021 | Revenue | Refunding | May 15, 2052 | $251,975,000 | $145,505,338 |
| Pub Impr Ref Bonds Ser 2016A | Apr 13, 2016 | Tax-supported (general obligation) | Refunding | Mar 1, 2038 | $251,955,000 | $46,913,075 |
| Comb Util Sys First Lein Rev Ref Bonds Ser 2018C (RMKT 7.16.2025) | Jul 24, 2025 | Revenue | Refunding | May 15, 2034 | $249,075,000 | $61,139,439 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2017B | May 4, 2017 | Revenue | Refunding | May 15, 2048 | $241,850,000 | $128,139,925 |
| Pub Impr Ref Bonds Ser 2019A | Sep 10, 2019 | Tax-supported (general obligation) | Refunding | Mar 1, 2049 | $234,125,000 | $87,589,900 |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2018B | Mar 20, 2018 | Revenue | Refunding | Jul 1, 2048 | $232,995,000 | $70,486,500 |
| Airport Sys Spec Facil Rev Bonds Ser 2021B-1 (United Airlines Inc Terminal Impr Proj) | Aug 31, 2021 | Revenue | Commerce | Jul 15, 2041 | $219,320,000 | $103,774,200 |
| Txbl Pension Oblig Ref Bonds Ser 2008A | Jan 8, 2009 | Tax-supported (general obligation) | Refunding | Mar 1, 2032 | $210,820,000 | $54,430,201 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2014B | Mar 27, 2014 | Revenue | Refunding | May 15, 2028 | $200,615,000 | $15,134,572 |
| Combined Util Sys First Lien Rev Ref Bonds Txbl Ser 2018E | Aug 21, 2018 | Revenue | Refunding | May 15, 2039 | $194,995,000 | $41,966,812 |
| Airport Sys Spec Facil Rev Bonds Ser 2015B-1 (AMT) (United Airlines Terminal Impr Proj) | Mar 26, 2015 | Revenue | Transportation | Jul 15, 2035 | $176,650,000 | $52,120,000 |
| Combined Util Sys First Lien Rev Ref Bonds Txbl Ser 2020D | Jul 1, 2020 | Revenue | Refunding | May 15, 2044 | $163,220,000 | $36,789,692 |
| Pub Impr Ref Bonds Ser 2021A | Aug 31, 2021 | Tax-supported (general obligation) | Refunding | Mar 1, 2041 | $146,950,000 | $39,192,000 |
| Combined Util Sys Sub Lien Rev Bonds Ser 2018F | Nov 16, 2018 | Revenue | Water and sewer | May 15, 2049 | $145,490,000 | $62,472,913 |
| Airport Sys Spec Facil Rev Ref Bonds Ser 2014 (United Airlines Inc Terminal E Proj) | Jun 2, 2014 | Revenue | Refunding | Jul 1, 2029 | $139,365,000 | $17,846,250 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2019B | Sep 17, 2019 | Revenue | Refunding | May 15, 2050 | $138,340,000 | $95,230,950 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2020A | Oct 20, 2020 | Revenue | Refunding | Jul 1, 2047 | $128,620,000 | $73,407,050 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2018C | Aug 2, 2018 | Revenue | Refunding | Jul 1, 2032 | $126,405,000 | $25,114,500 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2012A | Jun 21, 2012 | Revenue | Refunding | May 15, 2034 | $125,000,000 | $31,621,025 |
| Pub Impr Ref Bonds Ser 2021B (Txbl) | Aug 31, 2021 | Tax-supported (general obligation) | Refunding | Mar 1, 2042 | $114,230,000 | $12,983,295 |
| Combined Util Sys First Lien Rev Bonds Ser 2021C | Dec 21, 2021 | Revenue | Water and sewer | May 15, 2042 | $111,615,000 | $10,491,167 |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2023B (AMT) | Jul 19, 2023 | Revenue | Transportation | Jul 1, 2053 | $108,185,000 | $48,230,838 |
| Airport Sys Spec Facil Rev Bonds (Continental Airlines Inc Terminal Impr Proj) Ser 2011 (AMT) | Nov 17, 2011 | Revenue | Transportation | Jul 15, 2038 | $108,115,000 | $56,337,294 |
| Pub Impr Ref Bonds Ser 2024B | Jul 18, 2024 | Tax-supported (general obligation) | Refunding | Mar 1, 2044 | $105,375,000 | $46,470,750 |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2018A | Mar 20, 2018 | Revenue | Transportation | Jul 1, 2041 | $104,900,000 | $49,965,000 |
| Combined Util Sys First Lein Rev Ref Bonds Ser 2004B-5 (RMKT 10.24.2024) | Oct 24, 2024 | Tax-supported (general obligation) | Refunding | May 15, 2034 | $100,000,000 | $25,305,732 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2004B-2 (RMKT 3.31.2022) | Mar 31, 2022 | Revenue | Refunding | Aug 31, 2034 | $100,000,000 | $24,347,212 |
| Comb Util Sys First Lien Rev Ref Bonds Ser 2012B (RMKT 2021) | May 27, 2021 | Revenue | Refunding | May 15, 2034 | $100,000,000 | $25,293,420 |
| Convention & Entertainment Facil Department HOT & Spec Rev & Ref Bonds Ser 2015 | Mar 19, 2015 | Revenue | General purpose | Mar 1, 2045 | $91,460,000 | $37,637,325 |
| Airport Sys Spec Facil Rev Bonds Ser 2018 (United Airlines Inc Technical Operations Center Proj) | Feb 20, 2018 | Revenue | Transportation | Jul 15, 2028 | $90,650,000 | $13,597,500 |
| Combined Util Sys Sub Lien Rev Bonds Ser 2018B | May 30, 2018 | Revenue | Water and sewer | May 15, 2048 | $90,420,000 | $34,768,704 |
| Combined Util Sys First Lien Rev Ref Bonds Txbl Ser 2021B | Jun 24, 2021 | Revenue | Refunding | May 15, 2039 | $85,640,000 | $13,723,150 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2020A | Aug 19, 2020 | Revenue | Refunding | May 15, 2034 | $80,120,000 | $32,082,250 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2004B Subseries 6 (Remarketed 4/1/2012) (VR) | May 15, 2004 | Revenue | Refunding | Aug 31, 2034 | $78,325,000 | $19,067,874 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2004B-4 (RMKT 06.15.2023) | Jun 15, 2023 | Revenue | Refunding | Aug 31, 2034 | $75,000,000 | $18,254,753 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2004B Subseries 3 (Remarketed 4/6/2010) (VR) | Jun 10, 2004 | Revenue | Refunding | Aug 31, 2034 | $75,000,000 | $18,261,070 |
| Airport Sys Sub Lien Rev Ref Bonds Ser 2020B | Oct 20, 2020 | Revenue | Refunding | Jul 1, 2030 | $71,565,000 | $11,014,500 |
| Airport Sys Spec Facil Rev Bonds (United Airlines Inc Terminal E Proj) Ser 2021A (AMT) | Aug 31, 2021 | Revenue | Commerce | Jul 1, 2041 | $70,175,000 | $33,186,400 |
| Comb Util Sys Sub Lien Rev Bonds Ser 2017C | Nov 16, 2017 | Revenue | Water and sewer | May 15, 2048 | $67,940,000 | $24,372,978 |
| Airport Sys Spec Facil Rev Ref Bonds Ser 2020C (United Airlines Inc Airport Impr Proj) | Jun 29, 2020 | Revenue | Refunding | Jul 15, 2027 | $66,890,000 | $6,689,000 |
| Convention & Entertainment Facil Department HOT & Spec Rev & Ref Bonds Ser 2014 | Aug 20, 2014 | Revenue | Economic development | Mar 1, 2040 | $64,465,000 | $21,318,125 |
| Txbl Pension Oblig Bonds Ser 2007A | Mar 1, 2007 | Tax-supported (general obligation) | Pension obligations | Mar 1, 2037 | $63,800,000 | $38,992,781 |
| Txbl Pension Oblig Bonds Ser 2006A | Mar 29, 2006 | Tax-supported (general obligation) | Pension obligations | Mar 1, 2036 | $63,740,000 | $29,982,247 |
| Convention & Entertainment Facil Department HOT & Spec Rev & Ref Bonds Ser 2019 | Apr 30, 2019 | Revenue | General purpose | Mar 1, 2037 | $63,200,000 | $18,422,500 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2015D | Jul 9, 2015 | Revenue | Refunding | May 15, 2036 | $62,650,000 | $11,196,000 |
| Txbl GO Pension Bonds Ser 2005 | Mar 30, 2005 | Tax-supported (general obligation) | Pension obligations | Mar 1, 2035 | $57,165,000 | $20,761,038 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2007A- Exchanged | Jul 9, 2015 | Revenue | Refunding | May 15, 2037 | $56,135,000 | $29,564,125 |
| Combined Util Sys First Lien Rev Bonds Ser 2019A | Apr 18, 2019 | Revenue | Water and sewer | May 15, 2049 | $54,380,000 | $7,986,277 |
| Convention & Entertainment Facil Dept HOT & Spec Rev Bonds Ser 2001B | May 8, 2001 | Revenue | Economic development | Mar 1, 2034 | $53,432,050 | $205,342,950 |
| Combined Util Sys First Lien Rev Bonds Ser 2018A | Apr 11, 2018 | Revenue | Water and sewer | May 15, 2048 | $52,980,000 | $10,260,539 |
| Combined Util Sys First Lien Rev Bonds Ser 2017A | Feb 15, 2017 | Revenue | Water and sewer | May 15, 2047 | $51,515,000 | $9,266,323 |
| Combined Util Sys Sub Lien Rev Bonds Ser 2016D | Nov 15, 2016 | Revenue | Water and sewer | May 15, 2047 | $49,400,000 | $16,383,310 |
| Airport Sys Spec Facil Rev Ref Bonds Ser 2020B-2 (United Airlines Inc Terminal Impr Proj) | Jun 29, 2020 | Revenue | Refunding | Jul 15, 2027 | $47,470,000 | $4,747,000 |
| Airport Sys Spec Facil Rev Bonds Ser 2018C (United Airlines Inc Airport Impr Proj) | Feb 20, 2018 | Revenue | Transportation | Jul 15, 2028 | $46,425,000 | $6,963,750 |
| Combined Util Sys First Lien Rev Bonds Ser 2016A | Jan 20, 2016 | Revenue | Solid waste | May 15, 2046 | $46,090,000 | $7,315,231 |
| Combined Util Sys First Lien Rev Bonds Ser 2014A | Feb 12, 2014 | Revenue | Water and sewer | May 15, 2044 | $45,105,000 | $11,625,913 |
| Pub Impr Ref Bonds Ser 2019B (Txbl) | Sep 10, 2019 | Tax-supported (general obligation) | Refunding | Mar 1, 2043 | $40,500,000 | $7,045,383 |
| Combined Util Sys First Lien Rev Bonds Ser 2020B | Mar 5, 2020 | Revenue | Combined utility system | May 15, 2050 | $38,535,000 | $1,035,638 |
| Combined Util Sys First Lien Rev Bonds Ser 2015A | Jan 29, 2015 | Revenue | Water and sewer | May 15, 2045 | $38,360,000 | $5,996,235 |
| Airport Sys Spec Facil Rev Ref Bonds Ser 2020A (United Airlines Inc Terminal E Proj) | Jun 29, 2020 | Revenue | Refunding | Jul 1, 2027 | $34,165,000 | $3,416,500 |
| Airport Sys Spec Facil Txbl Rev Bonds (Cons Rental Care Facil Proj) Ser 2001 | Mar 22, 2001 | Revenue | Transportation | Aug 31, 2028 | $34,015,000 | $3,634,876 |
| Combined Util Sys Sub Lien Rev Bonds Ser 2020E | Nov 17, 2020 | Revenue | Combined utility system | May 15, 2050 | $33,510,000 | $9,493,595 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2012E | Sep 27, 2012 | Revenue | General purpose | May 15, 2043 | $31,725,000 | $4,970,358 |
| Combined Util Sys First Lein Rev Bonds Ser 2013A | Apr 3, 2013 | Revenue | Water and sewer | May 15, 2043 | $31,460,000 | $5,684,036 |
| Wtr & SS Jr Lien Rev Ref Bonds Ser 1998A | Jun 4, 1998 | Revenue | Refunding | Jun 1, 2029 | $25,302,438 | $98,572,562 |
| Combined Util Sys First Lien Rev Bonds Ser 2015B | Jan 29, 2015 | Revenue | Combined utility system | May 15, 2035 | $25,200,000 | $1,974,326 |
| Convention & Entertainment Facil Department HOT & Spec Rev Ref Bonds Ser 2021 | Aug 5, 2021 | Revenue | Refunding | Mar 1, 2034 | $24,570,000 | $3,983,675 |
| Airport Sys Sub Lien Rev Bonds Ser 2025B (Non-AMT) | Aug 13, 2025 | Revenue | Economic development | Jul 1, 2055 | $22,035,000 | $35,941,359 |
| Txbl Pub Impr Ref Bonds Ser 2011B | Oct 27, 2011 | Tax-supported (general obligation) | Refunding | Mar 1, 2041 | $20,250,000 | $14,087,520 |
| Combined Util Sys Sub Lien Rev Bonds Ser 2015E | Dec 3, 2015 | Revenue | Combined utility system | May 15, 2046 | $19,960,000 | $7,095,426 |
| Combined Util Sys First Lien Rev Bonds Ser 2011B | Jun 2, 2011 | Revenue | Water and sewer | May 15, 2041 | $16,515,000 | $4,464,891 |
| Txbl Pension Oblig Bonds Ser 2008B | Jan 8, 2009 | Tax-supported (general obligation) | Pension obligations | Mar 1, 2032 | $11,690,000 | $3,122,671 |
| Pub Impr Bonds Ser 2021D | Oct 1, 2021 | Tax-supported (general obligation) | Transportation | Mar 1, 2051 | $8,740,000 | $0 |
| Pub Impr Bonds Ser 2021E | Oct 1, 2021 | Tax-supported (general obligation) | Transportation | Mar 1, 2051 | $7,425,000 | $0 |
| Convention & Entertainment Facil Department HOT & Spec Rev Ref Bonds Ser 2017 | Nov 16, 2017 | Revenue | Refunding | Mar 1, 2034 | $6,865,000 | $719,036 |
| Txbl Pub Impr Ref Bonds Ser 2013B | May 16, 2013 | Tax-supported (general obligation) | Refunding | Mar 1, 2035 | $3,825,000 | $1,278,434 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2012F | Dec 19, 2012 | Revenue | Refunding | May 15, 2028 | $1,420,000 | $88,750 |
| Comb Util Sys First Lien Rev & Ref Bonds Ser 2018C (RMKT 7.29.2021) | Jul 29, 2021 | Revenue | Refunding | May 15, 2026 | $0 | $1,565,563 |
Earlier issues
Issues last reported before fiscal year 2025: repaid, refunded or matured.
- Combined Util Sys First Lien Rev Ref Bonds Ser 2004B-5 (RMKT 3.31.2022) closed Mar 31, 2022; last reported fiscal year 2024
- CO (Demolition Program) Ser 2021C closed Aug 31, 2021; last reported fiscal year 2024
- Combined Util Sys First Lien Rev Ref Bonds Ser 2014C closed Apr 15, 2014; last reported fiscal year 2024
- Pub Impr Ref Bonds Ser 2014A closed Aug 19, 2014; last reported fiscal year 2023
- Tax & Rev CO Ser 2013Q (QECB Direct Pay to Issuer) closed Oct 17, 2013; last reported fiscal year 2023
- Combined Util Sys First Lien Rev & Ref Bonds Ser 2013B closed May 23, 2013; last reported fiscal year 2023
- Combined Util Sys First Lien Rev Bonds Ser 2011C closed Jun 2, 2011; last reported fiscal year 2023
- Wtr & SS Jr Lien Rev Bonds Ser 2002C closed May 29, 2002; last reported fiscal year 2023
- Airport Sys Sub Lien Rev Bonds Ser 2000B (Non-AMT) closed Nov 15, 2000; last reported fiscal year 2023
- CO Ser 2013A (Demolition Program) closed May 16, 2013; last reported fiscal year 2022
- Pub Impr Ref Bonds Ser 2013A closed May 16, 2013; last reported fiscal year 2022
- Combined Util Sys First Lien Rev Ref Bonds Ser 2012D closed Sep 13, 2012; last reported fiscal year 2022
- Combined Util Sys First Lien Rev Ref Bonds Ser 2004B Subseries 4 (Remarketed 6/15/2023) (Remarketed 4/6/2010) (VR) closed May 15, 2004; last reported fiscal year 2022
- Airport Sys Sub Lien Rev Bonds Ser 2002B (Non-AMT) closed Aug 15, 2002; last reported fiscal year 2022
- Airport Sys Sub Lien Rev Bonds Ser 2002A (AMT) closed Aug 15, 2002; last reported fiscal year 2022
- Pub Impr Ref Bonds Ser 2019C closed Dec 4, 2019; last reported fiscal year 2021
- Pub Impr Bonds Ser 2018A closed Sep 14, 2018; last reported fiscal year 2021
- Combined Util Sys First Lien Rev Ref Bonds Ser 2018C (VR) closed Aug 1, 2018; last reported fiscal year 2021
- Pub Impr Ref Bonds Ser 2012A closed May 22, 2012; last reported fiscal year 2021
- Airport Sys Sub Lien Rev Ref Bonds Ser 2012A (AMT) closed Apr 5, 2012; last reported fiscal year 2021
- Airport Sys Sub Lien Rev Ref Bonds Ser 2012B (NON-AMT) closed Apr 5, 2012; last reported fiscal year 2021
- Combined Util Sys First Lien Rev Ref Bonds Ser 2011E closed Sep 28, 2011; last reported fiscal year 2021
- Combined Util Sys First Lien Rev Bonds Ser 2011D closed Jun 23, 2011; last reported fiscal year 2021
- Combined Util Sys First Lien Rev Ref Bonds Ser 2004B Subseries 2 (Remarketed 3/31/2022) closed Jun 10, 2004; last reported fiscal year 2021
- Combined Util Sys First Lien Rev Ref Bonds Ser 2004B Subseries 5 (Remarketed 3/31/2022) (VR) closed May 15, 2004; last reported fiscal year 2021
- Airport Sys Spec Facil Txbl Rev Ref Bonds Ser 2014 (Cons Rental Car Facil Proj) closed Sep 4, 2014; last reported fiscal year 2020
- Combined Util Sys First Lien Rev Ref Bonds Ser 2012B closed Jun 21, 2012; last reported fiscal year 2020
- Pub Impr Ref Bonds Ser 2011A closed Oct 27, 2011; last reported fiscal year 2020
- Convention & Entertainment Facil Department HOT & Spec Rev Ref Bonds Ser 2011A closed Aug 31, 2011; last reported fiscal year 2020
- Airport Sys Sub Lien Rev Ref Bonds Ser 2011B closed Jul 21, 2011; last reported fiscal year 2020
- Airport Sys Sub Lien Rev Ref Bonds Ser 2011A closed Jul 21, 2011; last reported fiscal year 2020
- Airport Sys Sub Lien Rev Ref Bonds Ser 2010 (NON-AMT) (VR) closed Dec 21, 2010; last reported fiscal year 2020
- Combined Util Sys First Lien Rev Ref Bonds Ser 2010A closed Feb 17, 2010; last reported fiscal year 2020
- Combined Util Sys First Lien Rev & Ref Bonds Ser 2008C closed Apr 21, 2008; last reported fiscal year 2020
- Airport Sys Spec Facil Rev Ref Bonds Ser 2015C (United Airlines Inc Airport Impr Proj) closed Mar 26, 2015; last reported fiscal year 2019
- Airport Sys Spec Facil Rev Ref Bonds Ser 2015B-2 (United Airlines Inc Terminal Impr Proj) closed Mar 26, 2015; last reported fiscal year 2019
- Combined Util Sys First Lien Rev Ref Bonds Ser 2011F closed Dec 1, 2011; last reported fiscal year 2019
- Combined Util Sys First Lien Rev Ref Bonds Ser 2011A closed Mar 9, 2011; last reported fiscal year 2019
- Pub Impr Ref Bonds Ser 2010A closed Dec 7, 2010; last reported fiscal year 2019
- Pub Impr Ref Bonds Txbl Ser 2010B (Direct-Subsidy Build America Bonds) closed Dec 7, 2010; last reported fiscal year 2019
- Combined Util Sys First Lien Rev Ref Bonds Ser 2010C closed Sep 1, 2010; last reported fiscal year 2019
- Pub Impr Ref Bonds Txbl Ser 2009B (Direct Subsidy-Build America Bonds) closed Sep 15, 2009; last reported fiscal year 2019
- Pub Impr Ref Bonds Ser 2009A closed Sep 15, 2009; last reported fiscal year 2019
- Combined Util Sys First Lien Rev & Ref Bonds Ser 2009A closed Apr 9, 2009; last reported fiscal year 2019
- Combined Util Sys First Lien Rev & Ref Bonds Ser 2008E closed Jan 2, 2009; last reported fiscal year 2018
- Combined Util Sys First Lien Rev & Ref Bonds Ser 2008B closed Apr 21, 2008; last reported fiscal year 2018
- Comb Util Sys First Lien Rev Ref Bonds Ser 2007B closed Jul 17, 2007; last reported fiscal year 2018
- Combined Util Sys First Lien Rev Ref Bonds Ser 2007A closed Jul 10, 2007; last reported fiscal year 2018
- Combined Util Sys First Lien Rev Ref Bonds Ser 2004 Fixed Rate Bonds Ser 2004A Tax-Exempt closed Jun 10, 2004; last reported fiscal year 2018
- Convention & Entertainment Facil Dept HOT & Spec Rev Adj Rate Bonds Ser 2001C closed May 8, 2001; last reported fiscal year 2018
- Combined Util Sys First Lien Rev Ref Bonds Ser 2016C (VR) closed Aug 1, 2016; last reported fiscal year 2017
- Pub Impr Ref Bonds Ser 2012B Txbl closed May 22, 2012; last reported fiscal year 2017
- HOT & Spec Rev Ref Bonds Ser 2011B closed Aug 31, 2011; last reported fiscal year 2017
- Airport Sys Sr Lien Rev & Ref Bonds Ser 2009A closed Aug 20, 2009; last reported fiscal year 2017
- Pub Impr Ref Bonds Ser 2008A closed Nov 12, 2008; last reported fiscal year 2017
- Pub Impr Ref Bonds Ser 2007A closed Dec 6, 2007; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Ref Bonds Ser 2007B (Non-AMT) closed Sep 12, 2007; last reported fiscal year 2017
- Combined Util Sys First Lien Rev Ref Bonds Ser 2005A closed Oct 11, 2005; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Bonds Ser 2002D-1 Auction Rate (AMT) closed Aug 15, 2002; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Bonds Ser 2002C Auction Rate (AMT) closed Aug 15, 2002; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Bonds Ser 2002D-2 (AMT) closed Aug 15, 2002; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Bonds Ser 2000P-2 (AMT) VR closed Nov 15, 2000; last reported fiscal year 2017
- Airport Sys Sub Lien Rev Bonds Ser 2000P-1 (AMT) VR closed Nov 15, 2000; last reported fiscal year 2017
- Pub Impr Ref Bonds Ser 1998A closed Aug 27, 1998; last reported fiscal year 2017
- Combined Util Sys First Lien Rev Ref Bonds Ser 2005 closed Sep 28, 2005; last reported fiscal year 2016
- Airport Sys Spec Facil Rev Bonds Ser 1997A (Automated People Mover Proj) closed Apr 17, 1997; last reported fiscal year 2016
- Wtr Conveyance Sys Contract COP Ser 1993H closed Jun 29, 1993; last reported fiscal year 2016
Source: Local Issuance Fee By Year (updated by the publisher Sep 9, 2026); Debt Outstanding By Issuance Local By Year (updated by the publisher Sep 9, 2026). Loaded here Oct 3, 2026.
Texas fiscal years run September 1 to August 31.
Figures are as reported to the agency and have not been independently verified.