City · Travis and Williamson counties · id 227-104-03

Austin

$7,657,632,000 of principal outstanding on 114 issues at the end of fiscal year 2025.

Fiscal year 2025 at a glance

Principal outstanding
$7.66 billion
Fiscal year 2025

$7,657,632,000

Interest still to be paid
$3.98 billion
Fiscal year 2025

$3,976,143,533

Total debt service outstanding
$11.63 billion
Fiscal year 2025

$11,633,775,533

Issues outstanding
114
Fiscal year 2025
Tax rate (total, per $100 of value)
0.4776
Fiscal year 2025
Taxable value
$237.7 billion
Fiscal year 2025

$237,686,551,572

Tax-supported principal to taxable value
0.80%
Fiscal year 2025

Computed here from the reported figures.

Principal per resident
$7,707
Fiscal year 2025

Computed here from the reported figures (population 993,588).

Debt outstanding by fiscal year

Download CSV
Principal outstanding at each fiscal year end; the table below gives the figures.FY 2016: $5,872,118,8422016FY 2017: $6,109,809,1242017FY 2018: $5,984,923,9322018FY 2019: $6,834,743,0242019FY 2020: $6,716,785,0002020FY 2021: $6,925,195,0002021FY 2022: $7,245,445,0002022FY 2023: $7,347,505,0002023FY 2024: $7,390,012,0002024FY 2025: $7,657,632,0002025
Debt outstanding at each fiscal year end
Fiscal yearPrincipalInterestTotal debt serviceIssuesTax rateTaxable value
2025$7,657,632,000$3,976,143,533$11,633,775,5331140.4776$237,686,551,572
2024$7,390,012,000$3,852,889,515$11,242,901,5151100.4458$239,277,638,736
2023$7,347,505,000$3,847,548,610$11,195,053,6101080.4627$220,662,475,477
2022$7,245,445,000$3,719,427,238$10,964,872,238990.5410$183,470,841,507
2021$6,925,195,000$3,500,905,898$10,426,100,898940.5335$178,038,717,790
2020$6,716,785,000$3,445,994,440$10,162,779,440940.4431$167,126,644,126
2019$6,834,743,024$3,680,100,731$10,514,843,755930.4403$153,202,045,256
2018$5,984,923,932$3,340,598,317$9,325,522,250850.4448$139,641,431,430
2017$6,109,809,124$3,605,142,636$9,714,951,759890.4418$126,650,143,583
2016$5,872,118,842$3,444,271,045$9,316,389,888910.4589$111,738,436,603

Issues outstanding, fiscal year 2025

Download CSV
Issues with principal outstanding, largest first
IssueClosedPledgePurposeFinal maturityPrincipalInterest
Wtr & WW Sys Rev Ref & Impr Bonds Ser 2024Jun 18, 2024RevenueWater and sewerMay 15, 2054$454,190,000$321,599,000
Airport Sys Rev Bonds Ser 2022May 18, 2022RevenueCommerceMay 15, 2053$416,060,000$356,692,363
Elec Util Sys Rev Ref & Impr Bonds Ser 2023May 17, 2023RevenueCombined utility systemMay 15, 2054$412,115,000$303,556,394
Pub Impr & Ref Bonds Ser 2024Dec 19, 2024Tax-supported (general obligation)General purposeMar 1, 2045$292,600,000$135,978,750
Elec Util Sys Rev Bonds Txbl Ser 2019AJun 13, 2019RevenueCombined utility systemMay 15, 2032$269,615,000$29,136,660
Wtr & Wastewater Sys Rev Ref Bonds Ser 2022Oct 27, 2022RevenueRefundingMay 15, 2053$269,100,000$149,690,500
Elec Util Sys Rev Ref Bonds Ser 2015AJun 2, 2015RevenueRefundingMay 15, 2046$262,690,000$159,876,000
Airport Sys Rev Bonds Ser 2014 (AMT)Jan 5, 2015RevenueTransportationMay 15, 2045$244,495,000$146,000,125
Wtr & Wastewater Sys Rev Ref Bonds Ser 2017Aug 22, 2017RevenueRefundingMay 15, 2047$242,270,000$109,081,500
Wtr & Wastewater Sys Rev Ref Bonds Ser 2016Jun 1, 2016RevenueRefundingMay 15, 2046$241,450,000$124,903,750
Elec Util Sys Rev Ref Bonds Ser 2024Dec 19, 2024RevenueRefundingMay 15, 2055$240,940,000$234,257,000
Airport Sys Rev Bonds Ser 2019BAug 13, 2019RevenueCommerceMay 15, 2049$234,105,000$167,858,625
Elec Util Sys Rev Ref & Impr Bonds Ser 2020ANov 17, 2020RevenuePowerMay 15, 2051$216,035,000$149,830,125
Wtr & Wastewater Sys Rev Ref Bonds Ser 2021Nov 18, 2021RevenueRefundingMay 15, 2052$211,715,000$105,429,975
Wtr & Wastewater Sys Rev Ref Bonds Ser 2020CNov 10, 2020RevenueRefundingMay 15, 2051$200,725,000$148,965,375
Pub Impr & Ref Bonds Ser 2023Oct 10, 2023Tax-supported (general obligation)General purposeMar 1, 2044$200,035,000$93,293,625
Airport Sys Rev Bonds Ser 2017AFeb 2, 2017RevenueTransportationMay 15, 2047$185,300,000$122,839,500
Elec Util Sys Rev Ref Bonds Ser 2019BAug 21, 2019RevenueRefundingMay 15, 2050$166,600,000$130,783,250
Rental Car Spec Facil Rev Ref Bonds Txbl Ser 2021Mar 2, 2021RevenueRefundingMay 15, 2043$144,330,000$35,891,371
Wtr & Wastewater Sys Rev Ref Bonds Ser 2023 (Forward Delivery)Feb 15, 2023RevenueRefundingMay 15, 2044$143,770,000$77,482,750
Airport Sys Rev Bonds Ser 2017B (AMT)Feb 2, 2017RevenueTransportationMay 15, 2047$129,665,000$85,956,375
Pub Impr & Ref Bonds Ser 2015Oct 6, 2015Tax-supported (general obligation)General purposeMar 1, 2036$129,655,000$19,241,365
Pub Impr & Ref Bonds Ser 2022Oct 13, 2022Tax-supported (general obligation)General purposeMar 1, 2043$128,150,000$54,388,500
Wtr & Wastewater Sys Rev Ref Bonds Ser 2015AAug 18, 2015RevenueRefundingMay 15, 2037$124,525,000$32,651,719
Pub Impr & Ref Bonds Ser 2021Oct 7, 2021Tax-supported (general obligation)General purposeMar 1, 2042$109,715,000$34,962,125
CO Ser 2024Dec 19, 2024Tax-supported (general obligation)Water and sewerMar 1, 2045$100,325,000$56,741,875
Elec Util Sys Rev Ref & Impr Bonds Txbl Ser 2019CAug 21, 2019RevenueCombined utility systemMay 15, 2050$98,370,000$49,538,474
Elec Util Sys Rev Ref Bonds Ser 2017Feb 14, 2017RevenueRefundingMay 15, 2039$95,790,000$41,862,250
Elec Util Sys Rev Ref Bonds Txbl Ser 2010B (Direct Subsidy-Build America Bonds)Jul 8, 2010RevenueRefundingMay 15, 2041$80,560,000$40,258,294
Wtr & Wastewater Sys Rev Ref Bonds Txbl Ser 2010B (Direct Subsidy-Build America Bonds)Dec 16, 2010RevenueRefundingMay 15, 2041$72,390,000$38,223,486
Pub Impr & Ref Bonds Ser 2019Oct 2, 2019Tax-supported (general obligation)General purposeMar 1, 2040$71,530,000$25,167,500
CO Ser 2020Oct 6, 2020Tax-supported (general obligation)General purposeMar 1, 2041$71,065,000$36,444,875
Pub Impr & Ref Bonds Txbl Ser 2021Oct 7, 2021Tax-supported (general obligation)General purposeMar 1, 2042$63,190,000$12,673,490
Pub Impr & Ref Bonds Ser 2020Oct 6, 2020Tax-supported (general obligation)General purposeMar 1, 2041$57,820,000$14,527,250
Pub Impr & Ref Bonds Ser 2016Oct 4, 2016Tax-supported (general obligation)General purposeMar 1, 2037$56,230,000$10,611,150
Elec Util Sys Rev Ref Bonds Txbl Ser 2012BDec 18, 2012RevenueRefundingMay 15, 2028$51,570,000$2,769,767
Elec Util Sys Rev Ref Bonds Txbl Ser 2020BNov 17, 2020RevenueRefundingMay 15, 2051$48,870,000$21,371,908
Pub Impr Bonds Txbl Ser 2022Oct 13, 2022Tax-supported (general obligation)General purposeMar 1, 2043$48,445,000$23,636,805
HOT Sub Lien VR Rev Ref Bonds Ser 2008Aug 14, 2008RevenueRefundingMay 15, 2030$38,380,000$2,790,120
Pub Impr Bonds Ser 2017Oct 3, 2017Tax-supported (general obligation)General purposeMar 1, 2038$36,865,000$11,714,875
Pub Impr Bonds Txbl Ser 2009B (Direct Subsidy-Build America Bonds)Sep 16, 2009Tax-supported (general obligation)General purposeMar 1, 2030$33,610,000$4,236,318
Pub Impr & Ref Bonds Txbl Ser 2020Oct 6, 2020Tax-supported (general obligation)General purposeMar 1, 2041$32,340,000$4,330,912
Pub Impr Bonds Txbl Ser 2019Oct 2, 2019Tax-supported (general obligation)General purposeMar 1, 2040$32,315,000$7,099,015
CO Ser 2021Oct 7, 2021Tax-supported (general obligation)General purposeMar 1, 2042$32,060,000$12,589,975
Pub Impr Bonds Txbl Ser 2024Dec 19, 2024Tax-supported (general obligation)General purposeMar 1, 2045$31,760,000$17,451,013
CO Ser 2016Oct 4, 2016Tax-supported (general obligation)General purposeMar 1, 2037$31,090,000$9,697,900
Wtr & Wastewater Sys Rev Bonds Ser 2017ANov 17, 2017RevenueWater and sewerMay 15, 2038$30,745,000$4,311,423
CO Ser 2015Oct 6, 2015Tax-supported (general obligation)General purposeMar 1, 2036$28,800,000$8,592,225
Elec Util Sys Rev Ref Bonds Txbl Ser 2015BJun 2, 2015RevenueRefundingMay 15, 2038$28,395,000$12,219,318
Wtr & Wastewater Sys Rev Bonds Ser 2021E (DWSRF)Nov 17, 2021RevenueWater and sewerMay 15, 2052$27,010,000$530,287
Pub Prop Finance Contr Oblig Ser 2024Dec 19, 2024Tax-supported (general obligation)General purposeMay 1, 2032$26,965,000$4,963,125
Airport Sys Rev Ref Bonds Ser 2019May 8, 2019RevenueRefundingMay 15, 2026$25,740,000$643,500
Wtr & Wastewater Sys Rev Bonds Ser 2024A (SWIRFT)Nov 19, 2024RevenueWater and sewerMay 15, 2045$25,000,000$7,148,871
CO Ser 2023Oct 10, 2023Tax-supported (general obligation)General purposeMar 1, 2044$24,935,000$13,640,375
Elec Util Sys Rev Ref Bonds Txbl Ser 2008Mar 27, 2008RevenueRefundingMay 15, 2033$24,870,000$6,739,791
Wtr & Wastewater Sys Rev Bonds Ser 2022B (DWSRF)Nov 17, 2022RevenueWater and sewerMay 15, 2053$23,400,000$8,749,761
CO Ser 2017Oct 3, 2017Tax-supported (general obligation)General purposeMar 1, 2038$22,105,000$7,899,125
Wtr & Wastewater Sys Rev Bonds Ser 2021D (CWSRF)Nov 17, 2021RevenueWater and sewerMay 15, 2052$20,790,000$218,330
Airport Sys Rev Bonds Ser 2013May 30, 2013RevenueTransportationMay 15, 2029$20,535,000$938,869
Pub Impr Bonds Ser 2012AOct 4, 2012Tax-supported (general obligation)General purposeMar 1, 2033$19,765,000$3,799,575
Pub Impr Bonds Txbl Ser 2017Oct 3, 2017Tax-supported (general obligation)General purposeMar 1, 2038$19,170,000$4,456,267
Pub Impr Bonds Ser 2018Oct 3, 2018Tax-supported (general obligation)General purposeMar 1, 2039$18,210,000$3,770,597
Wtr & Wastewater Sys Rev Bonds Ser 2010Jan 14, 2010RevenueWater and sewerMay 15, 2042$18,025,000$0
CO Txbl Ser 2021Oct 7, 2021Tax-supported (general obligation)General purposeMar 1, 2042$17,795,000$3,187,425
Wtr & Wastewater Sys Rev Bonds Ser 2023A (SWIRFT)Nov 16, 2023RevenueWater and sewerMay 15, 2044$17,305,000$5,832,177
Airport Sys Rev Bonds Ser 2019AAug 13, 2019RevenueCommerceMay 15, 2050$16,975,000$20,794,375
Wtr & Wastewater Sys Rev Bonds Ser 2022A (SWIRFT)Nov 17, 2022RevenueWater and sewerMay 15, 2043$16,535,000$5,240,175
Wtr & Wastewater Sys Rev Bonds Ser 2021CNov 17, 2021RevenueWater and sewerMay 15, 2042$15,470,000$2,151,780
CO Txbl Ser 2022Oct 13, 2022Tax-supported (general obligation)General purposeMar 1, 2043$15,310,000$7,445,598
Pub Prop Finance Contr Oblig Ser 2021Oct 7, 2021Tax-supported (general obligation)General purposeMay 1, 2029$15,280,000$1,718,000
Wtr & Wastewater Sys Rev Bonds Ser 2020DNov 17, 2020RevenueWater and sewerMay 15, 2041$13,770,000$1,445,051
Wtr & Wastewater Sys Rev Bonds Ser 2016ANov 17, 2016RevenueWater and sewerMay 15, 2037$12,890,000$1,538,671
CO Ser 2012Oct 4, 2012Tax-supported (general obligation)General purposeMar 1, 2038$12,795,000$1,941,850
Comb Tax & Surplus Rev CO Txbl Ser 2025 (CWSRF)Jan 22, 2025Tax-supported (general obligation)Water and sewerMar 1, 2045$12,160,000$3,941,373
Spec Assessment Rev Bonds Ser 2024 (Whisper Valley PID Impr Area 3)Dec 18, 2024RevenueGeneral purposeMay 1, 2054$11,990,000$11,043,251
Ref Bonds Ser 2016 (Town Lake Park Community Events Center Venue Proj)Nov 16, 2016RevenueRefundingMay 15, 2030$11,955,000$567,422
CO Txbl Ser 2019Oct 2, 2019Tax-supported (general obligation)General purposeMar 1, 2040$11,905,000$2,615,539
Wtr & Wastewater Sys Rev Ref Bonds Ser 2013AJul 25, 2013RevenueRefundingMay 15, 2044$9,360,000$173,160
Wtr & Wastewater Sys Rev Bonds Ser 2020AFeb 27, 2020RevenueWater and sewerMay 15, 2050$9,350,000$388,586
Wtr & Wastewater Sys Rev Bonds Ser 2021AJan 22, 2021RevenueWater and sewerMay 15, 2051$9,070,000$0
Pub Prop Finance Contr Oblig Ser 2020Oct 6, 2020Tax-supported (general obligation)General purposeMay 1, 2028$8,810,000$667,875
Pub Impr Bonds Txbl Ser 2014Oct 2, 2014Tax-supported (general obligation)General purposeMar 1, 2035$8,470,000$2,104,886
Wtr & Wastewater Sys Rev Bonds Ser 2021BJan 22, 2021RevenueWater and sewerMay 15, 2051$8,205,000$15,984
Pub Impr Bonds Txbl Ser 2016Oct 4, 2016Tax-supported (general obligation)General purposeMar 1, 2037$7,945,000$1,501,650
Wtr & Wastewater Sys Rev Bonds Ser 2022C (CWSRF)Nov 17, 2022RevenueWater and sewerMay 15, 2053$7,880,000$2,810,093
HOT Sub Lien Rev Ref Bonds Ser 2012 (Convention Center/Waller Creek Venue Proj)Mar 22, 2012RevenueRefundingMay 15, 2030$7,795,000$1,087,625
CO Txbl Ser 2024Dec 19, 2024Tax-supported (general obligation)Water and sewerMar 1, 2045$7,325,000$3,679,638
Pub Prop Finance Contr Oblig Ser 2023Oct 10, 2023Tax-supported (general obligation)General purposeMay 1, 2031$7,240,000$1,213,250
Elec Util Sys Rev Ref Bonds Ser 2012ADec 18, 2012RevenueRefundingMay 15, 2041$7,000,000$2,436,613
Spec Assessment Rev Bonds Ser 2022 (Whisper Valley PID Impr Area 2)Dec 22, 2022RevenueWater and sewerMay 1, 2052$6,727,000$6,834,575
Pub Impr Bonds Txbl Ser 2015Oct 6, 2015Tax-supported (general obligation)General purposeMar 1, 2036$6,570,000$1,563,545
Pub Prop Finance Contr Oblig Ser 2019Oct 2, 2019Tax-supported (general obligation)General purposeMay 1, 2027$6,345,000$318,875
Pub Prop Finance Contr Oblig Ser 2022Oct 13, 2022Tax-supported (general obligation)General purposeMay 1, 2030$6,270,000$811,375
CO Txbl Ser 2016Oct 4, 2016Tax-supported (general obligation)General purposeMar 1, 2037$5,760,000$1,086,821
CO Txbl Ser 2014Oct 2, 2014Tax-supported (general obligation)General purposeMar 1, 2035$5,705,000$1,189,020
CO Ser 2018Oct 3, 2018Tax-supported (general obligation)General purposeMar 1, 2039$5,600,000$1,484,322
Pub Impr Bonds Txbl Ser 2018Oct 3, 2018Tax-supported (general obligation)General purposeMar 1, 2039$5,470,000$1,545,784
Unl Tax Road Bonds Ser 2025Sep 10, 2025Tax-supported (general obligation)TransportationMar 1, 2051$5,000,000$4,142,105
Wtr & Wastewater Sys Rev Bonds Ser 2019Nov 13, 2019RevenueWater and sewerMay 15, 2040$4,780,000$619,156
Spec Assessment Rev Bonds Ser 2013 (Estancia Hill Country PID)Jul 16, 2013RevenueGeneral purposeMay 1, 2029$4,505,000$547,050
Spec Assessment Rev Bonds Sr Ser 2011 (Whisper Valley PID)Nov 16, 2011RevenueWater and sewerMar 1, 2027$4,500,000$350,831
Spec Assessment Rev Bonds Ser 2018 (Estancia Hill Country PID Impr Area 2)Dec 28, 2018RevenueGeneral purposeMay 1, 2034$4,380,000$1,113,406
CO Ser 2019Oct 2, 2019Tax-supported (general obligation)General purposeMar 1, 2040$4,190,000$1,727,525
Spec Assessment Rev Bonds Ser 2019 (Whisper Valley PID Impr Area 1)Apr 16, 2019RevenueGeneral purposeMay 1, 2049$4,180,000$3,028,266
Wtr & Wastewater Sys Rev Bonds Ser 2020BFeb 27, 2020RevenueWater and sewerMay 15, 2050$3,175,000$249,357
Pub Impr Bonds Txbl Ser 2012BOct 4, 2012Tax-supported (general obligation)General purposeMar 1, 2033$2,930,000$439,509
Spec Assessment Rev Bonds Ser 2018 (Estancia Hill Country PID Impr Area 1)Dec 28, 2018RevenueGeneral purposeMay 1, 2029$2,380,000$204,000
Wtr & WW Sys Rev Bonds Ser 2018Nov 20, 2018RevenueWater and sewerMay 15, 2039$2,215,000$384,282
Northwest Austin MUD 1 Unl Tax Ref & Impr Bonds Ser 2006Jul 11, 2006Tax-supported (general obligation)Water and sewerMar 1, 2027$1,870,000$78,200
Pub Prop Finance Contr Oblig Ser 2018Oct 3, 2018Tax-supported (general obligation)General purposeMay 1, 2026$1,770,000$35,400
Wtr & Wastewater Sys Rev Ref Bonds Ser 2014Jun 24, 2014RevenueRefundingMay 15, 2044$1,355,000$33,875
CO Ser 2013Oct 3, 2013Tax-supported (general obligation)General purposeMar 1, 2039$1,025,000$17,938
Spec Assessment Rev Bonds Sr Ser 2011 (Indian Hills PID)Nov 16, 2011RevenueWater and sewerMar 1, 2027$960,000$78,356
Wtr & Wastewater Sys Rev Ref Bonds Ser 2012Jul 31, 2012RevenueRefundingMay 15, 2030$500,000$12,500

Earlier issues

Issues last reported before fiscal year 2025: repaid, refunded or matured.

Source: Local Issuance Fee By Year (updated by the publisher Sep 9, 2026); Debt Outstanding By Issuance Local By Year (updated by the publisher Sep 9, 2026). Loaded here Oct 3, 2026.

Texas fiscal years run September 1 to August 31.

Figures are as reported to the agency and have not been independently verified.