Skip the issues greenberg traurig llp worked on table| Issue? | Issuer? | Closed? | FY? | Role? | Sale type? | Par? | Fees to this firm? | Per $1,000 of par? |
|---|---|---|---|---|---|---|---|---|
| Spec Assessment Rev Bonds Ser 2025 (Arboretum Estates PID 6 Impr Area 1 Proj) | Terrell | 8/28/2025 | 2025 | Underwriter's counsel | Negotiated | $21,375,000 | $213,750 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Arboretum Estates Pub ID 6 Major Impr Area Proj) | Terrell | 8/28/2025 | 2025 | Underwriter's counsel | Negotiated | $23,468,000 | $234,680 | Not reported |
| CO Ser 2025B | Pearland | 8/26/2025 | 2025 | Underwriter's counsel | Negotiated | $115,480,000 | $57,740 | Not reported |
| CO Ser 2025A | Pearland | 8/26/2025 | 2025 | Underwriter's counsel | Negotiated | $18,955,000 | $9,478 | Not reported |
| Perm Impr & Ref Bonds Ser 2025 | Pearland | 8/26/2025 | 2025 | Underwriter's counsel | Negotiated | $33,400,000 | $16,700 | Not reported |
| Unl Tax School Bldg Bonds Ser 2025 | Rotan ISD | 8/21/2025 | 2025 | Underwriter's counsel | Negotiated | $6,405,000 | $10,000 | $1.56 |
| Unl Tax School Bldg & Ref Bonds Ser 2025 | Spring ISD | 8/14/2025 | 2025 | Underwriter's counsel | Negotiated | $598,180,000 | $89,727 | Not reported |
| Airport Sys Sub Lien Rev & Ref Bonds Ser 2025A (AMT) | Houston | 8/13/2025 | 2025 | Disclosure counsel | Negotiated | $677,820,000 | $386,437 | $0.57 |
| Unl Tax School Bldg Bonds Ser 2025 | Bluff Dale ISD | 8/13/2025 | 2025 | Underwriter's counsel | Negotiated | $995,000 | $8,000 | Not reported |
| Airport Sys Sub Lien Rev Bonds Ser 2025B (Non-AMT) | Houston | 8/13/2025 | 2025 | Disclosure counsel | Negotiated | $22,035,000 | $12,563 | $0.57 |
| Spec Assessment Rev Bonds Ser 2025 (Sofi Lake Sections 1 & 2 Proj) | East Waller County Management District | 7/23/2025 | 2025 | Underwriter's counsel | Negotiated | $25,634,000 | $256,340 | $10.00 |
| Spec Assessment Rev Bonds Ser 2025 (Southridge PID Impr Area 3 Proj) | Princeton | 6/25/2025 | 2025 | Underwriter's counsel | Negotiated | $7,739,000 | $77,390 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Windmore PID Impr Area 2 Proj) | Princeton | 6/25/2025 | 2025 | Underwriter's counsel | Negotiated | $6,712,000 | $67,120 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Lone Oak PID Impr Area 1 Proj) | Alvarado | 6/17/2025 | 2025 | Underwriter's counsel | Negotiated | $5,601,000 | $56,010 | Not reported |
| CO Ser 2025 | Texas City | 6/11/2025 | 2025 | Bond counsel | Competitive | $70,855,000 | $175,000 | $2.47 |
| Spec Assessment Rev Bonds Ser 2025 (Major Impr Area Proj) | University Hills MMD | 6/10/2025 | 2025 | Underwriter's counsel | Negotiated | $20,250,000 | $202,500 | $10.00 |
| Spec Assessment Rev Bonds Ser 2025 (Impr Area 1 Proj) | University Hills MMD | 6/10/2025 | 2025 | Underwriter's counsel | Negotiated | $32,734,000 | $327,340 | $10.00 |
| Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone A Remainder Area Proj) | Pilot Point | 5/15/2025 | 2025 | Underwriter's counsel | Negotiated | $7,280,000 | $72,800 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone B Remainder Area Proj) | Pilot Point | 5/15/2025 | 2025 | Underwriter's counsel | Negotiated | $6,044,000 | $60,440 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone A Impr Area 1 Proj) | Pilot Point | 5/15/2025 | 2025 | Underwriter's counsel | Negotiated | $25,227,000 | $252,270 | Not reported |
| Spec Assesment Rev Bonds Ser 2025 (Bryson Ranch PID Zone B Impr Area 1 Proj) | Pilot Point | 5/15/2025 | 2025 | Underwriter's counsel | Negotiated | $18,046,000 | $180,460 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Durango PID Impr Area 2 Proj) | Mustang Ridge | 5/13/2025 | 2025 | Underwriter's counsel | Negotiated | $6,189,000 | $61,890 | $10.00 |
| Spec Assessment Rev Bonds Ser 2025 (Valverde PID Impr Area 1) | Bastrop | 4/17/2025 | 2025 | Underwriter's counsel | Negotiated | $12,303,000 | $123,030 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Bridges Phs 2A PID Proj) | Gunter | 4/10/2025 | 2025 | Underwriter's counsel | Negotiated | $6,466,000 | $64,660 | Not reported |
| Spec Assess Rev Bonds Ser 2025 (Sutton Fields East PID Phase 2 Proj) | Celina | 4/3/2025 | 2025 | Underwriter's counsel | Negotiated | $10,250,000 | $102,500 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Green Meadows PID Impr Area 1 Proj) | Denton County | 3/31/2025 | 2025 | Underwriter's counsel | Negotiated | $64,142,000 | $641,420 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Green Meadows PID Major Impr Area Proj) | Denton County | 3/31/2025 | 2025 | Underwriter's counsel | Negotiated | $82,239,000 | $822,390 | Not reported |
| Spec Assessment Rev Bonds Ser 2025 (Duck Point PID) | Aubrey | 3/27/2025 | 2025 | Underwriter's counsel | Negotiated | $30,727,000 | $307,270 | $10.00 |
| Spec Assessment Rev Bonds Ser 2025 (River Ridge PID Impr Area 2 Proj) | Crandall | 3/18/2025 | 2025 | Underwriter's counsel | Negotiated | $17,398,000 | $173,980 | Not reported |
| Unl Tax School Bldg Bonds Ser 2025 | Aspermont ISD | 3/12/2025 | 2025 | Underwriter's counsel | Negotiated | $7,295,000 | $8,500 | Not reported |
| Spec Asessment Rev Bonds Ser 2025 (Meadowlark Preserve PID Proj) | Pflugerville | 3/11/2025 | 2025 | Underwriter's counsel | Negotiated | $14,772,000 | $147,720 | $10.00 |
| Sr Lien Ref Bonds Ser 2024A | Harris County-Houston Sports Authority | 11/20/2024 | 2025 | Disclosure counsel | Negotiated | $241,115,000 | $135,627 | $0.56 |
| Second Lien Ref Bonds Ser 2024B | Harris County-Houston Sports Authority | 11/20/2024 | 2025 | Disclosure counsel | Negotiated | $129,885,000 | $73,060 | $0.56 |
| Unl Tax School Bldg Bonds Ser 2024 | Hallettsville ISD | 8/29/2024 | 2024 | Underwriter's counsel | Negotiated | $10,755,000 | $10,000 | Not reported |
| Unl Tax School Bldg Bonds Ser 2024 | Harrold ISD | 8/27/2024 | 2024 | Underwriter's counsel | Negotiated | $9,825,000 | $10,000 | Not reported |
| Unl Tax School Bldg Bonds Ser 2024 | Aquilla ISD | 8/16/2024 | 2024 | Underwriter's counsel | Negotiated | $9,085,000 | $10,000 | $1.10 |
| Unl Tax School Bldg Bonds Ser 2024 | Lyford CISD | 8/15/2024 | 2024 | Bond counsel | Competitive | $3,480,000 | $6,500 | $1.87 |
| Unl Tax School Bldg Bonds Ser 2024 | Comanche ISD | 8/13/2024 | 2024 | Underwriter's counsel | Negotiated | $28,850,000 | $15,000 | Not reported |
| CO Ser 2024 | Reno (a) | 6/27/2024 | 2024 | Underwriter's counsel | Negotiated | $3,260,000 | $8,500 | Not reported |
| Toll Road First Lien Rev & Ref Bonds Ser 2024A | Harris County | 6/11/2024 | 2024 | Bond counsel | Negotiated | $950,000,000 | $423,969 | $0.45 |
| Combined Util Sys First Lien Rev Ref Bonds Ser 2024A | Houston | 5/14/2024 | 2024 | Bond counsel | Competitive | $870,280,000 | $618,750 | $0.71 |
| Unl Tax School Bldg Bonds Ser 2024 | Covington ISD | 2/29/2024 | 2024 | Underwriter's counsel | Negotiated | $9,940,000 | $12,500 | Not reported |
| Unl Tax School Bldg Bonds Ser 2024 | Booker ISD | 2/27/2024 | 2024 | Underwriter's counsel | Negotiated | $4,760,000 | $10,000 | Not reported |
| Unl Tax School Bldg Bonds Ser 2024 | Judson ISD | 2/8/2024 | 2024 | Underwriter's counsel | Negotiated | $245,890,000 | $86,062 | $0.35 |
| Time Warrants Ser 2023 | Richards ISD | 12/20/2023 | 2024 | Bond counsel | Private placement | $527,000 | $6,500 | $12.33 |
| Comb Tax & Rev CO Ser 2023A | Del Rio | 12/13/2023 | 2024 | Underwriter's counsel | Negotiated | $12,510,000 | $9,383 | Not reported |
| Sr Lien Spec Tax Rev Bonds Ser 2023 (Fair Park Venue Proj) | Dallas | 11/28/2023 | 2024 | Underwriter's counsel | Negotiated | $43,360,000 | $23,500 | Not reported |
| Sr Lien Spec Tax Rev Bonds Ser 2023 (Kay Bailey Hutchison Convention Center Dallas Venue Proj) | Dallas | 11/28/2023 | 2024 | Underwriter's counsel | Negotiated | $170,600,000 | $63,500 | Not reported |
| Spec Assessment Rev Bonds Ser 2023 (Haggard Farm PID Impr Area 1 Proj) | Plano | 11/20/2023 | 2024 | Other counsel | Negotiated | $5,000,000 | $35,000 | $7.00 |
| Spec Assessment Rev Bonds Ser 2023 (Haggard Farm PID Major Impr Area Proj) | Plano | 11/20/2023 | 2024 | Other counsel | Negotiated | $16,458,000 | $35,000 | $2.13 |
| Total, all 130 | $12,874,792 |
Spec Assessment Rev Bonds Ser 2025 (Arboretum Estates PID 6 Impr Area 1 Proj)
- Closed
- 8/28/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $21,375,000
- Fees to this firm
- $213,750
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Arboretum Estates Pub ID 6 Major Impr Area Proj)
- Closed
- 8/28/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $23,468,000
- Fees to this firm
- $234,680
- Per $1,000 of par
- Not reported
- Closed
- 8/26/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $115,480,000
- Fees to this firm
- $57,740
- Per $1,000 of par
- Not reported
- Closed
- 8/26/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $18,955,000
- Fees to this firm
- $9,478
- Per $1,000 of par
- Not reported
Perm Impr & Ref Bonds Ser 2025
- Closed
- 8/26/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $33,400,000
- Fees to this firm
- $16,700
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2025
- Closed
- 8/21/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,405,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- $1.56
Unl Tax School Bldg & Ref Bonds Ser 2025
- Closed
- 8/14/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $598,180,000
- Fees to this firm
- $89,727
- Per $1,000 of par
- Not reported
Airport Sys Sub Lien Rev & Ref Bonds Ser 2025A (AMT)
- Closed
- 8/13/2025
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Negotiated
- Par
- $677,820,000
- Fees to this firm
- $386,437
- Per $1,000 of par
- $0.57
Unl Tax School Bldg Bonds Ser 2025
- Closed
- 8/13/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $995,000
- Fees to this firm
- $8,000
- Per $1,000 of par
- Not reported
Airport Sys Sub Lien Rev Bonds Ser 2025B (Non-AMT)
- Closed
- 8/13/2025
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Negotiated
- Par
- $22,035,000
- Fees to this firm
- $12,563
- Per $1,000 of par
- $0.57
Spec Assessment Rev Bonds Ser 2025 (Sofi Lake Sections 1 & 2 Proj)
- Closed
- 7/23/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $25,634,000
- Fees to this firm
- $256,340
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2025 (Southridge PID Impr Area 3 Proj)
- Closed
- 6/25/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $7,739,000
- Fees to this firm
- $77,390
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Windmore PID Impr Area 2 Proj)
- Closed
- 6/25/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,712,000
- Fees to this firm
- $67,120
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Lone Oak PID Impr Area 1 Proj)
- Closed
- 6/17/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $5,601,000
- Fees to this firm
- $56,010
- Per $1,000 of par
- Not reported
- Closed
- 6/11/2025
- FY
- 2025
- Role
- Bond counsel
- Sale type
- Competitive
- Par
- $70,855,000
- Fees to this firm
- $175,000
- Per $1,000 of par
- $2.47
Spec Assessment Rev Bonds Ser 2025 (Major Impr Area Proj)
- Closed
- 6/10/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $20,250,000
- Fees to this firm
- $202,500
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2025 (Impr Area 1 Proj)
- Closed
- 6/10/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $32,734,000
- Fees to this firm
- $327,340
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone A Remainder Area Proj)
- Closed
- 5/15/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $7,280,000
- Fees to this firm
- $72,800
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone B Remainder Area Proj)
- Closed
- 5/15/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,044,000
- Fees to this firm
- $60,440
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Bryson Ranch PID Zone A Impr Area 1 Proj)
- Closed
- 5/15/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $25,227,000
- Fees to this firm
- $252,270
- Per $1,000 of par
- Not reported
Spec Assesment Rev Bonds Ser 2025 (Bryson Ranch PID Zone B Impr Area 1 Proj)
- Closed
- 5/15/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $18,046,000
- Fees to this firm
- $180,460
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Durango PID Impr Area 2 Proj)
- Closed
- 5/13/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,189,000
- Fees to this firm
- $61,890
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2025 (Valverde PID Impr Area 1)
- Closed
- 4/17/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $12,303,000
- Fees to this firm
- $123,030
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Bridges Phs 2A PID Proj)
- Closed
- 4/10/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $6,466,000
- Fees to this firm
- $64,660
- Per $1,000 of par
- Not reported
Spec Assess Rev Bonds Ser 2025 (Sutton Fields East PID Phase 2 Proj)
- Closed
- 4/3/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $10,250,000
- Fees to this firm
- $102,500
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Green Meadows PID Impr Area 1 Proj)
- Closed
- 3/31/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $64,142,000
- Fees to this firm
- $641,420
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Green Meadows PID Major Impr Area Proj)
- Closed
- 3/31/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $82,239,000
- Fees to this firm
- $822,390
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2025 (Duck Point PID)
- Closed
- 3/27/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $30,727,000
- Fees to this firm
- $307,270
- Per $1,000 of par
- $10.00
Spec Assessment Rev Bonds Ser 2025 (River Ridge PID Impr Area 2 Proj)
- Closed
- 3/18/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $17,398,000
- Fees to this firm
- $173,980
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2025
- Closed
- 3/12/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $7,295,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- Not reported
Spec Asessment Rev Bonds Ser 2025 (Meadowlark Preserve PID Proj)
- Closed
- 3/11/2025
- FY
- 2025
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $14,772,000
- Fees to this firm
- $147,720
- Per $1,000 of par
- $10.00
- Closed
- 11/20/2024
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Negotiated
- Par
- $241,115,000
- Fees to this firm
- $135,627
- Per $1,000 of par
- $0.56
Second Lien Ref Bonds Ser 2024B
- Closed
- 11/20/2024
- FY
- 2025
- Role
- Disclosure counsel
- Sale type
- Negotiated
- Par
- $129,885,000
- Fees to this firm
- $73,060
- Per $1,000 of par
- $0.56
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 8/29/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $10,755,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 8/27/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,825,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 8/16/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,085,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- $1.10
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 8/15/2024
- FY
- 2024
- Role
- Bond counsel
- Sale type
- Competitive
- Par
- $3,480,000
- Fees to this firm
- $6,500
- Per $1,000 of par
- $1.87
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 8/13/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $28,850,000
- Fees to this firm
- $15,000
- Per $1,000 of par
- Not reported
- Closed
- 6/27/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $3,260,000
- Fees to this firm
- $8,500
- Per $1,000 of par
- Not reported
Toll Road First Lien Rev & Ref Bonds Ser 2024A
- Closed
- 6/11/2024
- FY
- 2024
- Role
- Bond counsel
- Sale type
- Negotiated
- Par
- $950,000,000
- Fees to this firm
- $423,969
- Per $1,000 of par
- $0.45
Combined Util Sys First Lien Rev Ref Bonds Ser 2024A
- Closed
- 5/14/2024
- FY
- 2024
- Role
- Bond counsel
- Sale type
- Competitive
- Par
- $870,280,000
- Fees to this firm
- $618,750
- Per $1,000 of par
- $0.71
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 2/29/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $9,940,000
- Fees to this firm
- $12,500
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 2/27/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $4,760,000
- Fees to this firm
- $10,000
- Per $1,000 of par
- Not reported
Unl Tax School Bldg Bonds Ser 2024
- Closed
- 2/8/2024
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $245,890,000
- Fees to this firm
- $86,062
- Per $1,000 of par
- $0.35
- Closed
- 12/20/2023
- FY
- 2024
- Role
- Bond counsel
- Sale type
- Private placement
- Par
- $527,000
- Fees to this firm
- $6,500
- Per $1,000 of par
- $12.33
- Closed
- 12/13/2023
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $12,510,000
- Fees to this firm
- $9,383
- Per $1,000 of par
- Not reported
Sr Lien Spec Tax Rev Bonds Ser 2023 (Fair Park Venue Proj)
- Closed
- 11/28/2023
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $43,360,000
- Fees to this firm
- $23,500
- Per $1,000 of par
- Not reported
Sr Lien Spec Tax Rev Bonds Ser 2023 (Kay Bailey Hutchison Convention Center Dallas Venue Proj)
- Closed
- 11/28/2023
- FY
- 2024
- Role
- Underwriter's counsel
- Sale type
- Negotiated
- Par
- $170,600,000
- Fees to this firm
- $63,500
- Per $1,000 of par
- Not reported
Spec Assessment Rev Bonds Ser 2023 (Haggard Farm PID Impr Area 1 Proj)
- Closed
- 11/20/2023
- FY
- 2024
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $5,000,000
- Fees to this firm
- $35,000
- Per $1,000 of par
- $7.00
Spec Assessment Rev Bonds Ser 2023 (Haggard Farm PID Major Impr Area Proj)
- Closed
- 11/20/2023
- FY
- 2024
- Role
- Other counsel
- Sale type
- Negotiated
- Par
- $16,458,000
- Fees to this firm
- $35,000
- Per $1,000 of par
- $2.13
Rows 1–50 of 130
Fees are as BRB's table reports them for each issue. The underwriter's spread counts once, and median and per-$1,000 figures use the issuer's one-time costs only: rows paid by the underwriter are shown in the fees but not added to them (how the participant tables are made).
EMMA links appear after review.
Source: Local Issuance Fee By Year (updated by the publisher 10/6/2026). Loaded here 10/9/2026.
Texas fiscal years run September 1 to August 31.
Issuer names are shown as published, without source footnote letters.
Figures are as reported to the agency and have not been independently verified.