$14,445,615,000 of principal outstanding on 113 issues at the end of fiscal year 2025.

Fiscal year 2025 at a glance

Principal outstanding
$14.45 billion
Fiscal year 2025

$14,445,615,000

Interest still to be paid
$8.44 billion
Fiscal year 2025

$8,442,059,964

Total debt service outstanding
$22.89 billion
Fiscal year 2025

$22,887,674,964

Issues outstanding
113
Fiscal year 2025
Tax rate (total, per $100 of value)
0.5416
Fiscal year 2025
Taxable value
$160.4 billion
Fiscal year 2025

$160,405,200,722

Tax-supported principal to taxable value
1.82%
Fiscal year 2025

Computed here from the reported figures.

Principal per resident
$9,462
Fiscal year 2025

Computed here from the reported figures (population 1,526,656).

Debt outstanding by fiscal year

Download CSV
Principal outstanding at each fiscal year end; the table below gives the figures.FY 2016: $10,114,760,0002016FY 2017: $10,506,370,0002017FY 2018: $10,625,865,0002018FY 2019: $10,634,515,0002019FY 2020: $10,700,105,0002020FY 2021: $11,310,270,0002021FY 2022: $11,762,085,0002022FY 2023: $12,826,200,0002023FY 2024: $13,289,830,0002024FY 2025: $14,445,615,0002025
Debt outstanding at each fiscal year end
Fiscal yearPrincipalInterestTotal debt serviceIssuesTax rateTaxable value
2025$14,445,615,000$8,442,059,964$22,887,674,9641130.5416$160,405,200,722
2024$13,289,830,000$7,957,506,605$21,247,336,6051120.5416$155,456,627,306
2023$12,826,200,000$7,496,467,336$20,322,667,3361130.5416$145,314,086,965
2022$11,762,085,000$6,733,154,877$18,495,239,8771060.5583$131,942,745,012
2021$11,310,270,000$6,587,760,974$17,898,030,9741060.5583$127,540,657,910
2020$10,700,105,000$6,482,227,341$17,182,332,3411030.5583$121,037,297,498
2019$10,634,515,000$6,727,069,005$17,361,584,0051040.5583$114,656,051,900
2018$10,625,865,000$6,773,845,830$17,399,710,8301040.5583$107,717,233,327
2017$10,506,370,000$6,963,329,849$17,469,699,8491050.5583$99,333,287,043
2016$10,114,760,000$6,812,222,622$16,926,982,6221010.5583$90,639,163,872

Issues outstanding, fiscal year 2025

Download CSV
Issues with principal outstanding, largest first
IssueClosedPledgePurposeFinal maturityPrincipalInterest
Elec & Gas Sys Rev Ref Bonds New Ser 2024DSep 18, 2024RevenueRefundingAug 15, 2054$487,995,000$425,821,625
Elec & Gas Sys Rev Ref Bonds New Ser 2023AJun 22, 2023RevenueRefundingAug 1, 2050$458,055,000$387,541,756
Elec & Gas Sys Rev Ref Bonds New Ser 2024AJun 25, 2024RevenueRefundingAug 1, 2049$452,220,000$407,018,831
Elec & Gas Sys Rev & Ref Bonds New Ser 2024BJun 25, 2024RevenuePowerAug 1, 2054$450,205,000$392,494,381
Elec & Gas Sys Rev Bonds Txbl New Ser 2012Mar 29, 2012RevenueCombined utility systemAug 1, 2042$404,225,000$206,047,742
Elec & Gas Sys Rev Bonds Txbl New Ser 2009C (Direct Subsidy Build America Bonds)Jun 12, 2009RevenueCombined utility systemAug 1, 2039$375,000,000$249,738,369
Elec & Gas Sys Fixed & VR Jr Lien Rev Ref Bonds Ser 2022Feb 15, 2022RevenueRefundingAug 1, 2049$359,465,000$293,341,683
Elec & Gas Sys Jr Lien Rev Ref Bonds Ser 2021AApr 8, 2021RevenueRefundingAug 1, 2049$330,700,000$263,618,000
Elec & Gas Sys Rev Ref Bonds Txbl New Ser 2020Nov 5, 2020RevenueRefundingAug 1, 2048$328,635,000$155,377,445
Elec & Gas Sys Rev Ref Bonds New Ser 2016Jul 28, 2016RevenueRefundingAug 1, 2034$317,880,000$60,507,500
General Impr & Ref Bonds Ser 2019Aug 29, 2019Tax-supported (general obligation)General purposeAug 1, 2040$310,950,000$92,845,950
General Impr Ref Bonds Txbl Ser 2020Jul 16, 2020Tax-supported (general obligation)RefundingAug 1, 2034$309,225,000$22,674,686
Elec & Gas Sys Jr Lien Rev Bonds Txbl Ser 2010A (Direct Subsidy-Build America Bonds)Nov 4, 2010RevenueCombined utility systemAug 1, 2041$300,000,000$249,151,003
Elec & Gas Sys Rev Bonds Txbl New Ser 2010A (Build America Bonds-Direct Subsidy)Mar 23, 2010RevenueCombined utility systemAug 1, 2041$280,000,000$190,031,726
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2016C (No Reserve Fund)Nov 1, 2016RevenueWater and sewerMay 15, 2046$271,605,000$137,971,400
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2023A (No Reserve Fund)Aug 17, 2023RevenueWater and sewerMay 15, 2053$271,135,000$224,815,350
Tax Notes Txbl Ser 2023Aug 31, 2023Tax-supported (general obligation)CommerceAug 1, 2026$269,635,000$7,596,966
Elec & Gas Sys Rev Ref Bonds New Ser 2024ESep 18, 2024RevenueRefundingAug 1, 2049$268,710,000$240,028,006
Elec & Gas Sys Rev & Ref Bonds New Ser 2017Apr 27, 2017RevenuePowerAug 1, 2047$267,320,000$159,163,850
Wtr Sys Jr Lien Rev Bonds Ser 2024B (No Reserve Fund)Oct 29, 2024RevenueWater and sewerMay 15, 2047$265,075,000$178,569,000
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2021A (No Reserve Fund)Jul 13, 2021RevenueWater and sewerMay 15, 2051$254,470,000$176,642,300
Elec & Gas Sys Jr Lien Rev Ref Bonds Ser 2019Nov 21, 2019RevenueRefundingAug 1, 2041$252,640,000$117,613,350
Wtr Sys Jr Lien Rev Bonds Ser 2022B (No Reserve Fund)Oct 18, 2022RevenueWater and sewerMay 15, 2052$246,440,000$218,472,925
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2020A (No Reserve Fund)Feb 19, 2020RevenueWater and sewerMay 15, 2050$236,845,000$143,417,950
Elec & Gas Sys Rev Bonds New Ser 2015Dec 3, 2015RevenueCombined utility systemAug 1, 2039$235,000,000$66,267,548
General Impr & Ref Bonds Ser 2025Aug 28, 2025Tax-supported (general obligation)General purposeAug 1, 2045$221,650,000$97,533,313
Elec & Gas Sys Rev Ref Bonds Txbl New Ser 2022Apr 13, 2022RevenueRefundingAug 1, 2047$207,825,000$150,284,236
Tax Notes Txbl Ser 2025May 22, 2025Tax-supported (general obligation)CommerceAug 1, 2032$200,000,000$48,822,540
Elec & Gas Sys Rev Ref Bonds New Ser 2017Aug 30, 2017RevenueRefundingAug 1, 2047$194,980,000$123,390,300
Elec & Gas Sys Rev Ref Bonds New Ser 2024CJun 25, 2024RevenueRefundingAug 1, 2054$193,265,000$205,239,350
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2018AMay 23, 2018RevenueWater and sewerMay 15, 2048$190,705,000$130,998,250
Elec & Gas Sys Rev Ref Bonds New Ser 2015Aug 13, 2015RevenueRefundingAug 1, 2032$184,055,000$29,463,403
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2025A (No Reserve Fund)Feb 18, 2025RevenueRefundingMay 15, 2039$181,225,000$108,087,250
Elec & Gas Sys Rev Ref Bonds New Ser 2023BJun 22, 2023RevenueRefundingAug 1, 2044$177,130,000$120,814,513
GO Impr Bond Ser 2024Sep 18, 2024Tax-supported (general obligation)General purposeAug 1, 2044$169,635,000$93,114,125
Wtr Sys VR Jr Lien Rev Bonds Ser 2019A (No Reserve Fund)Jan 29, 2019RevenueWater and sewerMay 1, 2049$166,480,000$73,410,750
Wtr Sys Sub Lien Rev Ref Bonds Ser 2024ASep 11, 2024RevenueRefundingMay 1, 2054$165,310,000$140,829,958
Elec & Gas Sys Rev Ref Bonds New Ser 2023CNov 7, 2023RevenueRefundingAug 1, 2042$160,560,000$77,533,250
Wtr Sys Jr Lien Rev Bonds Ser 2020C (No Reserve Fund)Aug 11, 2020RevenueWater and sewerMay 15, 2050$153,390,000$101,102,881
Elec & Gas Sys Jr Lien Rev Ref Bonds Ser 2018 (VR)Dec 20, 2018RevenueRefundingAug 1, 2048$134,870,000$218,205,200
Elec & Gas Sys Rev Ref Bonds Ser 2020Jan 28, 2020RevenueRefundingAug 1, 2049$134,580,000$96,129,750
Elec & Gas Sys Rev Ref Bonds New Ser 2018ADec 20, 2018RevenueRefundingAug 1, 2048$130,220,000$63,824,750
Elec & Gas Sys JR Lien Rev Ref Bonds Ser 2020 VRJan 28, 2020RevenueRefundingAug 1, 2049$127,770,000$179,802,175
General Impr Bonds Ser 2023Aug 31, 2023Tax-supported (general obligation)Water and sewerAug 1, 2043$126,135,000$44,413,175
Elec & Gas Sys Rev Ref Bonds New Ser 2018Nov 15, 2018RevenueRefundingAug 1, 2028$122,425,000$12,250,250
Elec & Gas Sys Rev Ref Bonds New Ser 2019Sep 25, 2019RevenueRefundingAug 1, 2030$114,685,000$11,622,750
Customer Facil Charge Rev Bonds Txbl Ser 2015 (Cons Rental Car Spec Facil Proj)Jul 29, 2015RevenueGeneral purposeJul 1, 2045$113,515,000$81,050,713
Comb Tax & Rev CO Ser 2025Aug 28, 2025Tax-supported (general obligation)General purposeAug 1, 2045$112,770,000$42,356,613
General Impr Bonds Ser 2020Sep 10, 2020Tax-supported (general obligation)General purposeAug 1, 2040$112,700,000$38,708,400
Elec & Gas Sys VR Jr Lien Rev Ref Bonds Ser 2015BJan 7, 2015RevenueRefundingAug 1, 2033$104,150,000$21,049,675
General Impr Bonds Ser 2018Aug 30, 2018Tax-supported (general obligation)General purposeAug 1, 2038$103,310,000$35,628,800
General Impr Bonds Ser 2021Aug 26, 2021Tax-supported (general obligation)General purposeAug 1, 2041$102,510,000$39,618,700
Wtr Sys Jr Lien Rev Ref Bonds Ser 2016A (No Reserve Fund)Feb 25, 2016RevenueRefundingMay 15, 2040$101,375,000$30,357,263
Elec & Gas Sys VR Jr Lien Rev Ref Bonds Ser 2023Jun 22, 2023RevenueRefundingAug 15, 2053$100,340,000$207,312,280
Wtr Sys VR Jr Lien Rev & Ref Bonds Ser 2014B (No Reserve Fund)Apr 30, 2014RevenueGeneral purposeMay 1, 2044$99,590,000$26,551,533
Elec & Gas Sys VR Jr Lien Rev Bonds Ser 2015DDec 3, 2015RevenueCombined utility systemJun 1, 2046$99,450,000$137,012,400
Comb Tax & Rev CO Ser 2018Aug 30, 2018Tax-supported (general obligation)General purposeAug 1, 2038$98,805,000$36,490,850
Wtr Sys VR Jr Lien Rev & Ref Bonds Ser 2013F (No Reserve Fund)Nov 6, 2013RevenueGeneral purposeMay 1, 2043$98,420,000$33,724,200
Wtr Sys Rev Ref Bonds Ser 2025BFeb 25, 2025RevenueRefundingMay 15, 2040$88,940,000$43,115,750
Wtr Sys Jr Lien Rev Ref Bonds Ser 2022A (No Reserve Fund)Feb 15, 2022RevenueRefundingMay 15, 2042$77,785,000$42,151,200
Comb Tax & Rev CO Ser 2022Aug 25, 2022Tax-supported (general obligation)Water and sewerAug 1, 2042$72,045,000$31,367,375
General Impr Bonds Txbl Ser 2022Aug 25, 2022Tax-supported (general obligation)Housing landAug 1, 2042$69,535,000$28,410,482
Wtr Sys Jr Lien Rev Ref Bonds Ser 2019C (No Reserve Fund)Oct 23, 2019RevenueRefundingMay 15, 2039$69,150,000$26,828,500
General Impr & Ref Bonds Ser 2016Aug 31, 2016Tax-supported (general obligation)General purposeAug 1, 2036$65,115,000$9,401,750
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2015B (No Reserve Fund)Feb 18, 2015RevenueWater and sewerMay 15, 2045$61,920,000$39,553,400
Wtr Sys Jr Lien Rev Ref Bonds Ser 2017A (No Reserve Fund)Feb 28, 2017RevenueRefundingMay 15, 2037$57,080,000$20,030,200
Comb Tax & Rev CO Ser 2016Aug 31, 2016Tax-supported (general obligation)General purposeAug 1, 2036$55,475,000$12,584,450
Tax Notes Ser 2025Aug 28, 2025Tax-supported (general obligation)General purposeAug 1, 2028$54,440,000$3,513,350
Wtr Sys Jr Lien Rev Bonds Ser 2015AJan 21, 2015RevenueWater and sewerMay 15, 2045$53,855,000$10,968,542
General Impr Bonds Ser 2017Aug 31, 2017Tax-supported (general obligation)General purposeAug 1, 2037$53,630,000$14,661,750
General Impr Bonds Ser 2022Aug 25, 2022Tax-supported (general obligation)Water and sewerAug 1, 2042$52,055,000$22,663,225
Comb Tax & Rev CO Ser 2017Aug 31, 2017Tax-supported (general obligation)General purposeAug 1, 2037$42,280,000$11,251,200
Wtr Sys Jr Lien Rev Bonds Ser 2013DOct 31, 2013RevenueWater and sewerMay 15, 2043$40,965,000$13,689,265
Comb Tax & Rev CO Ser 2023Aug 31, 2023Tax-supported (general obligation)Water and sewerAug 1, 2033$39,575,000$8,433,375
Comb Tax & Rev CO Ser 2016 (VR)Dec 19, 2016Tax-supported (general obligation)General purposeAug 1, 2046$39,240,000$11,875,776
Passenger Facil Charge & Sub Lien Airport Sys Rev Ref Bonds Ser 2019ADec 5, 2019RevenueRefundingJul 1, 2032$38,105,000$7,352,750
Tax Notes Ser 2024Sep 18, 2024Tax-supported (general obligation)General purposeAug 1, 2027$37,405,000$1,893,625
Wtr Sys Jr Lien Rev Ref Bonds Ser 2013BJun 6, 2013RevenueRefundingMay 15, 2034$36,435,000$9,718,000
Comb Tax & Rev CO Ser 2021Aug 26, 2021Tax-supported (general obligation)General purposeAug 1, 2041$35,715,000$11,547,600
Airport Sys Rev Impr Bonds Ser 2015 (AMT)Jul 29, 2015RevenueGeneral purposeJul 1, 2045$33,640,000$20,346,750
Comb Tax & Rev CO Ser 2020Sep 10, 2020Tax-supported (general obligation)General purposeAug 1, 2040$31,830,000$10,295,450
Airport Sys Rev Ref Bonds Ser 2019ADec 5, 2019RevenueRefundingJul 1, 2032$30,030,000$6,298,750
Airport Sys Rev Ref Bonds Txbl Ser 2019BDec 5, 2019RevenueRefundingJul 1, 2040$29,830,000$8,871,991
Wtr Sys Sub Lien Rev & Ref Bonds Ser 2003A (VR)Mar 27, 2003RevenueRefundingMay 15, 2033$29,490,000$9,770,600
Wtr Sys Jr Lien Rev & Ref Bonds Ser 2014Apr 30, 2014RevenueGeneral purposeMay 15, 2029$27,150,000$3,022,750
Wtr Sys Jr Lien Rev Bonds Ser 2014CJun 18, 2014RevenueWater and sewerMay 15, 2044$26,320,000$6,542,115
Passenger Facil Charge & Sub Lien Airport Sys Rev Ref Bonds Txbl Ser 2019BDec 5, 2019RevenueRefundingJul 1, 2040$25,315,000$7,990,763
Comb Tax & Rev CO Txbl Ser 2015Aug 25, 2015Tax-supported (general obligation)General purposeAug 1, 2035$25,290,000$5,351,306
Wtr Sys Jr Lien Rev Bonds Ser 2019B (Drinking Wtr State Revolving Fund)Sep 25, 2019RevenueWater and sewerMay 15, 2049$24,780,000$1,787,267
Comb Tax & Rev CO Ser 2019Aug 29, 2019Tax-supported (general obligation)General purposeAug 1, 2039$24,605,000$7,390,900
Municipal Drainage Util Sys Rev Ref Bonds Ser 2013May 16, 2013RevenueRefundingAug 1, 2030$24,510,000$2,339,981
Wtr Sys Jr Lien Rev Bonds Ser 2020BMar 18, 2020RevenueWater and sewerMay 15, 2050$21,185,000$1,557,287
Wtr Sys Jr Lien Rev Bonds Ser 2013AMay 7, 2013RevenueWater and sewerMay 15, 2033$21,035,000$1,554,367
Wtr Sys Sub Lien Rev & Ref Bonds Ser 2003B (VR)Mar 27, 2003RevenueWater and sewerMay 15, 2033$20,335,000$6,737,500
Bexar Metropolitan WD WW Sys Rev Ref Bonds Ser 2002Aug 8, 2002RevenueWater and sewerMay 1, 2032$18,995,000$4,085,306
Comb Tax & Rev CO Txbl Ser 2021AAug 26, 2021Tax-supported (general obligation)General purposeAug 1, 2041$18,805,000$3,946,337
Comb Tax & Rev CO Txbl Ser 2021May 12, 2021Tax-supported (general obligation)General purposeAug 1, 2035$14,085,000$1,794,327
Comb Tax & Rev CO Txbl Ser 2025Aug 28, 2025Tax-supported (general obligation)Water and sewerAug 1, 2045$13,575,000$8,253,027
Comb Tax & Rev CO Txbl Ser 2016Aug 31, 2016Tax-supported (general obligation)RecreationAug 1, 2036$13,460,000$2,240,828
Wtr Sys Jr Lien Rev Ref Bonds Txbl Ser 2016B (No Reserve Fund)Feb 25, 2016RevenueRefundingMay 15, 2030$12,770,000$1,677,349
Airport Sys Rev Ref Bonds Ser 2012 (AMT)May 30, 2012RevenueRefundingJul 1, 2027$12,375,000$936,000
Comb Tax & Rev CO Txbl Ser 2020Sep 10, 2020Tax-supported (general obligation)General purposeAug 1, 2040$11,925,000$2,043,118
Wtr Sys Jr Lien Rev Bonds Ser 2012Aug 28, 2012RevenueWater and sewerMay 15, 2042$11,925,000$1,914,563
Wtr Sys Jr Lien Rev Bonds Ser 2013CDec 5, 2013RevenueWater and sewerMay 15, 2033$11,550,000$1,361,855
Wtr Sys Jr Lien Rev Bonds Ser 2014DJun 19, 2014RevenueWater and sewerMay 15, 2034$10,695,000$974,857
Wtr Sys Jr Lien Rev Bonds Ser 2016EDec 14, 2016RevenueWater and sewerMay 15, 2046$10,635,000$1,789,519
Wtr Sys Jr Lien Rev Bonds Ser 2020DDec 3, 2020RevenueWater and sewerMay 15, 2050$9,830,000$175,843
Wtr Sys Jr Lien Rev Bonds Ser 2016DDec 15, 2016RevenueWater and sewerMay 15, 2046$9,240,000$1,498,535
Wtr Sys Jr Lien Rev Bonds Ser 2018BJun 14, 2018RevenueWater and sewerMay 15, 2048$8,420,000$1,848,031
Comb Tax & Rev CO Txbl Ser 2018Aug 30, 2018Tax-supported (general obligation)Economic developmentAug 1, 2038$6,260,000$1,883,889
Passenger Facil Charge & Sub Lien Airport Sys Ref Bonds Ser 2012 (AMT)May 30, 2012RevenueRefundingJul 1, 2027$4,655,000$281,200
Comb Tax & Rev CO Ser 2015Aug 25, 2015Tax-supported (general obligation)General purposeAug 1, 2035$2,730,000$907,725
Bexar-Medina-Atascosa Counties WCID 1 WW Sys Rev Notes Ser 2010May 4, 2010RevenueWater and sewerAug 1, 2030$335,000$75,375

Earlier issues

Issues last reported before fiscal year 2025: repaid, refunded or matured.

Source: Local Issuance Fee By Year (updated by the publisher Sep 9, 2026); Debt Outstanding By Issuance Local By Year (updated by the publisher Sep 9, 2026). Loaded here Oct 3, 2026.

Texas fiscal years run September 1 to August 31.

Figures are as reported to the agency and have not been independently verified.